What's new

R'jim Mâatoug Tunisian army project against desert

Tunisian Marine Corps

FULL MEMBER
Joined
Apr 16, 2012
Messages
660
Reaction score
1
Country
Tunisia
Location
Tunisia
@BLACKEAGLE and @Mootaz-khelifi and @ Syrian Lion see this

HISTORIC OUTLINE
THE PROJECT’S ZONE
PRESENTATION OF THE PROJECT
THE PROJECT FIRST SLICE
PROGRAM OF REHABILITATION AND SUPPORT FOR THE 1st SLICE
THE PROJECT SECOND SLICE
THE PROJECT REACHED OBJECTIVES
PERSPECTIVES

1 - HISTORIC OUTLINE :

The desert character which contained Rjim Maâtoug's region could not allow a source of life. The area was frequented by a nomad population.

Since the 70s of previous century, a very important groundwater in the western South of Tunisia was discovered (common resources with Algeria and Libya, and covering 1000000 km2). A such discovery activated an operation of experiment through the realization of three drillings in 1984 which allowed to highlight 300 hectares (ha) of palm trees plantations in Rjim Maâtoug's zone and «Matrouha».

This experience which was realized by appropriate means of the Tunisian government and which aimed at the settlement of the border zone's population, gave a full satisfaction.

Since the change of November 7, 1987 and once the Socioeconomic study was elaborated within the framework of a guiding plan for the valuation of the waters of the South and through a global vision of the country’s development, the great project of development of Rjim Maâtoug aiming at the development of 2500 ha of palm trees plantations was thrown launched.

The realization of this project was confided to the Office of Development of Rjim Maâtoug (ODRM), one of the Establishments of The Ministry of Defence.

2 - THE PROJECT’S ZONE :



2.1- Location :

Governorate : «Kebili»

Region : Nefzaoua

Delegation : «El-Faouar»

On both sides of the road Rjim Maâtoug - Matrouha

In 120 km on the West of the city of «Kebili», between the great oriental erg and «Chott Djerid».
2.2- Natural characteristics :



Climate : Continental Saharan type

Sand wind : 100 days / year with sirocco

Average rainfall : less than 100 mm / year

Average temperature : 21°C with extremes of 55 °C in summer (in the shadow) and - 7°C in winter (at night)

Soil : sandy

Water resources : the quota of Tunisia in this zone is 2000 liters by second (l/s). A such debit is enough to create 2500 ha of palm trees

3 -PRESENTATION OF THE PROJECT :

2500 ha of desert ground were highlighted by means of the plantation of palm trees, to attribute them to the farmers at the rate of 1.5 ha by beneficiary with a rural housing.



3.1 - The project’s Objectives :

Fighting against the desertification by the creation of a green cordon between the great oriental erg and «Chott Djerid»

Fixing the nomad population by improving their life conditions

Creating new jobs

Easing the old oases

Increasing the productions of the dates «Deglet Nour» of 20000 tons.
3.2 - The realization phases :

Experimental phase of 300 ha in «Rjim Maâtoug» and «Matrouha» ( 1984-1987 )

First slice of 1152 ha : (1990-2001)

Second slice of 1008 ha : (2002-2009)

4 - THE PROJECT FIRST SLICE :



4.1 - Object :

The object of the project’s first slice is the development of 1152 ha of desert ground in palm trees and their conversation during 5 years during period 1990-2001, as well as the creation of all the necessary basic infrastructures.
The allocation of the small areas of 1.5 ha and housings (by the Ministry of State administered properties) to the beneficiaries was finished according to the financing protocol signed between the Tunisian Republic and the European Community in 2001 in August, 1989.
4.2 - Cost and Financing :

The cost of realization of the project first slice was 32 000 000 Dinars (D) distributed as follows :
Tunisia : 10 000 000 D

European Union : 15 000 000 D

Italy : 7 000 000 D



4.3 - Realizations :

Creation of 17 drillings

Hydraulic organization of 1152 ha (irrigation and drainage)

Plantation of 1152 ha

Protection of 1152 ha by the creation of 480 km of dry palms fences

Creation of 120 ha of forested bands

Creation of 25 km of agricultural track

Construction of :

770 rural housings (Nasr village and Ferdaous village)
2 mosques
2 primary schools
1 school
2 advice Centers
1 Moorish bath
1 training centre for the rural girl
Supply of the project zone in electricity through an electric line : 94 km

Tarred road connecting «Rjim Maâtoug» with «El-Faouar» : 70 km

4.4 - The beneficiaries : :

728 beneficiaries of farmer's small area (1.5 ha)

09 beneficiaries of engineer's small area (4.5 - 6 ha)

5 -PROGRAM OF REHABILITATION AND SUPPORT FOR THE 1st SLICE :

Further to the estimate of the first slice, a program of rehabilitation and support was set up :

5.1 - Common program :

Regeneration of 16 drillings

Placing of a water economy network over 1152 ha

Maintenance of the main networks of irrigation and drainage

Placing of a popularization cell

5.2 - At the small areas level :

Replacement of dead refusals

Protection of the small areas

Operations of levelling and backfilling

Maintenance of the secondary networks

Supply of inputs

5.3 - At the assignees level :

Insure a minimal income to the assignees thanks to a monthly premium according to the degree of entrance in production of the small area and for the respect for the contract's clauses.

5.4 - At the ODRM level :

Signature of the cooperation agreements with the specialized institutes :
Institute of the Dry Regions

National Institute of Agronomic Searches

Institute of Searches on the Palm Tree

Office of the Breeding

Establish of the Olive Tree

5.5 - At the associative activities level :

Construction of 4 premises for the associations of collective interest

City toll of a bottom of movement for every association of collective interest

Training's days organization in aid of the farmers and AIC members

Approach of the administrative departments to the local population

6 -THE PROJECT SECOND SLICE :



6.1 -Object :

Creation of 1008 ha of palm trees : 672 small areas of 1.5 ha with construction of housing and all the necessary infrastructures.

The distribution of the small area from the plantation to a temporary assignee, according to a contract and well defined choice criteria. And this counterpart 7 years (date in that plantations become productive).

In the end of 7th year, small areas are given up in Ministry of the State's Domains allowing the temporary assignee to sign a definitive rental agreement with the Ministry of Defence
6.2 -Cost and Financing : Cooperation Agreement between the Tunisian Republic and Italy : 2002 - 2009

Estimative Cost (42 300 000 D) :

Tunisia : 22 980 000 D
Italy : 19 320 000 D
6.3 -Improvements brought to the second slice :

a. At the procedures level :

Creation of a Tuniso-Italian mixed committee, charged of : oversee, estimate the set of the project activities and approve the program and the annual budget

Fixation of the assignees choice criteria aiming at a better valuation of the small area

Adoption of a support program for the assignees during 7 years, with a follow-up / estimate and assistance to the assignees
b.At technical level :

Approach of villages with regard to oases

Intensification of the protection of oases and small areas

Increase of the plantation density

Adoption of an irrigation network allowing a water economy

Improvement of housings : covered surface, conception and quality
6.4 - Realizations :

Creation of 07 drillings

Organization and placing of irrigation network on 504 ha

Plantation of 504 ha

Creation of 25 km of agricultural track

Creation of 240 km of protection by fences in dry palms

Construction of :
286 rural housings for the assignees
01 primary school
01 advice center
A pit of a public market
01 rural center for the young people
6.5 - The beneficiaries :

163 common assignees : 1.5 ha / assignee

86 graduate assignees (higher education) : 3 ha / assignee



7 -THE PROJECT REACHED OBJECTIVES :

Creation of a green cordon on a length of 25 km; real barrier against the advanced of the desert
Creation of income's permanent sources for the local population and improvement of life's conditions for about 1500 beneficiaries (6000 inhabitants)
Creation of an economical dynamics (commitment of the assigned budgets and entrance of small areas to production)
Increase of the production (dates, fruits, vegetables, feeds, meats …)


8 -PERSPECTIVES :

Project durability for a better management of water resources

Diversification of products essentially those that can be exported : Biologic products, Fruits, Vegetables, Feeds, Meats …
Valuation of the drainage waters

Encouragement of the deprived service companies

008.jpg

rjimmaatoug.jpg

066.jpg

004.jpg

071.jpg

015.jpg

048.jpg

TUNISIAN ARMY DO THIS
 
Last edited by a moderator:
. . .
yeah it's great project and no other army will do it
or even participate in country development like building houses and making roads , bridges , fighting forest fire ....
 
.

Latest posts

Country Latest Posts

Back
Top Bottom