Indos
PDF THINK TANK: ANALYST
- Joined
- Jul 25, 2013
- Messages
- 23,466
- Reaction score
- 24
- Country
- Location
PT Dirgantara Indonesia has revealed its MALE UAV prototype for the first time to the public in its latest Instagram Post. The program has been reported in various mainstream Indonesian media since 2016, the time where the preliminary design is started. The program reached detail design phase in 2018 and is designed to have maximum endurance of 30 hours and can fly into altitude 30.000 feet.
MALE consortium consist of BPPT (Government research agency), PT Dirgantara Indonesia(PTDI), PT LEN Industry, LAPAN (Space agency), Indonesian Air Force, and Bandung Institute of Technology. BPPT is the consortium leader who have 80 % contribution on design and engineering. PTDI is responsible on some design work and production. BPPT and LAPAN are government research agency which have experience in designing UAV. PT LEN Industry is responsible in developing flight control and mission system.
According to the PT DI engineer involved in the program, the development will be done in 4 phase (Block) in which the first block (Block 0) is only mean to test its flying performance, second block (Block L) is plan to have indigenous mission system developed by PT LEN Industry, third block (Block D) will be installed with ISR (Intelligent, Surveilance, Reconnaisance) mission system. Fourth block (Block C-Combat) will have attack capability.
Expected Maiden Flight is the end of 2020 or beginning of 2021 according to latest interview with DI engineer involved in the program. First and second block still use fixed landing gear while third and fourth block will use retractable landing gear where landing gear can be inserted into the plane body.
The post talks about Indonesian Research and Technology minister visiting PT DI to see development of N 219 and UAV program and discuss those program with PT DI Director.
MALE consortium consist of BPPT (Government research agency), PT Dirgantara Indonesia(PTDI), PT LEN Industry, LAPAN (Space agency), Indonesian Air Force, and Bandung Institute of Technology. BPPT is the consortium leader who have 80 % contribution on design and engineering. PTDI is responsible on some design work and production. BPPT and LAPAN are government research agency which have experience in designing UAV. PT LEN Industry is responsible in developing flight control and mission system.
According to the PT DI engineer involved in the program, the development will be done in 4 phase (Block) in which the first block (Block 0) is only mean to test its flying performance, second block (Block L) is plan to have indigenous mission system developed by PT LEN Industry, third block (Block D) will be installed with ISR (Intelligent, Surveilance, Reconnaisance) mission system. Fourth block (Block C-Combat) will have attack capability.
Expected Maiden Flight is the end of 2020 or beginning of 2021 according to latest interview with DI engineer involved in the program. First and second block still use fixed landing gear while third and fourth block will use retractable landing gear where landing gear can be inserted into the plane body.
The post talks about Indonesian Research and Technology minister visiting PT DI to see development of N 219 and UAV program and discuss those program with PT DI Director.
Last edited: