Evaluation: Plan to set up power plants near gas fields shelved – The Express Tribune
And few days ago we read about Gaddani power park getting shelved too. Has PMLN managed to bring a single power plant online in past 18 months or so? I used to be optimist about this government but enough is enough now. The way things are, I think we'll have same level of loadshedding in 2018 if not more.
And few days ago we read about Gaddani power park getting shelved too. Has PMLN managed to bring a single power plant online in past 18 months or so? I used to be optimist about this government but enough is enough now. The way things are, I think we'll have same level of loadshedding in 2018 if not more.