IAC is scheduled for commissioning end 2018 and is being monitored very closely by the Indian Navy
Seems to be completed externally. Placing equipments, cabling, piping etc must be going on.
its a coat cant tuck this inNice..... But Seriously Admiral has to do something with his way of dressing.. May be he should tuck his shirt in
its a coat cant tuck this in
atleast 70-80 % work is done so lets wait for some more picjsSeems to be completed externally. Placing equipments, cabling, piping etc must be going on.
The external work/hull fabricaton completion figure is far higher- around 90%, it is the outfitting (the internals) that is now being undertaken.atleast 70-80 % work is done so lets wait for some more picjs