What's new

PEPCO Pakistan website hacked to take out anger against loadshedding

PDF

STAFF
Joined
May 1, 2015
Messages
3,786
Reaction score
34
Country
Pakistan
Location
Pakistan
PEPCO Pakistan website hacked
pepco-650x309.jpg




LAHORE (Web Desk) – Pakistan Electric Power Company (PEPCO) website has been hacked by hackers identifying themselves as Bilal and Ch3rn0byl.

The home page of the website has a banner put up on it, saying ‘site ki load shedding mubarik ho’ or ‘Congratulations on site’s load shedding’, Dunya News cited.

The home page is completely black with plain text written on it in red, green and white colors. The text goes on to say at the bottom of the page, “We wish you from the bottom of our hearts ….. hope you understand”.
PEPCO Pakistan website hacked - Daily Pakistan Global
 
. .
Another misguided attack on people who had nothing to do with the load shedding. It takes at least 5 to 10 or even 15 years to build the electricity generation stations, Hydro dams, nuclear power plants, etc. The 2,000 MW Karachi Nuclear plants will take 8-10 years to build. It takes planning and non-stop construction.
 
.
It takes at least 5 to 10 or even 15 years to build electricity generation stations, Hydro dams, nuclear power plants, etc.
It took 2 to make metro from scratch...if similar dedication is put in power generation, it wouldnt take 2 to AT LEAST REDUCE the intensity!
 
Last edited:
.
Looks like even a small child can easily hack significant websites. This happens when 6 years olds become expert at microsoft etc...:crazy_pilot:
 
.
Another misguided attack on people who had nothing to do with the load shedding. It takes at least 5 to 10 or even 15 years to build the electricity generation stations, Hydro dams, nuclear power plants, etc. The 2,000 MW Karachi Nuclear plants will take 8-10 years to build. It takes planning and non-stop construction.
specially in a country where everyone is busy in making babies rather then dams :p:
 
. .
Foolish thing to do.

It took 2 to make metro from scratch...if similar dedication is put in power generation, it wouldnt take 2 to AT LEAST REDUCE the intensity!

You can't equate the two, the metro projects far less time consuming, even with the planning, research and feasibility studies thrown in, power generation is far slower and harder to get going.
 
.
Foolish thing to do.



You can't equate the two, the metro projects far less time consuming, even with the planning, research and feasibility studies thrown in, power generation is far slower and harder to get going.
I am talking about similar DEDICATION thrown in to actually improve the power sector....in 2 yrs you can DEF put new lines, pass laws and make sure action is taken against power thieves .....All this can REDUCE loadshedding and CAN be done in 2 yrs!

Foolish thing to do.
Frustrated people dont think far...they act! Half the nation is frustrated and Noonis think Metro will make that frustration go away :unsure:
 
.
I am talking about similar DEDICATION thrown in to actually improve the power sector....in 2 yrs you can DEF put new lines, pass laws and make sure action is taken against power thieves .....All this can REDUCE loadshedding and CAN be done in 2 yrs!


Frustrated people dont think far...they act! Half the nation is frustrated and Noonis think Metro will make that frustration go away :unsure:
True......But one thing's for sure..."metro bus ny islamabad ko chaar chaand lga dia hain":smitten:
FB_IMG_1435876933921.jpg
 
.
True......But one thing's for sure..."metro bus ny islamabad ko chaar chaand lga dia hain":smitten:
View attachment 234834
That is a stupid post! ....Isb was already a good city even before the metro.....the very fact that its going to crash the economy because it is subsidized and going in negative....people climbing it for ac coz no loadshedding (hence showing alot of use when in reality it is going in loss) calling it something like that is sickening!
 
.
That is a stupid post! ....Isb was already a good city even before the metro.....the very fact that its going to crash the economy because it is subsidized and going in negative....people climbing it for ac coz no loadshedding (hence showing alot of use when in reality it is going in loss) calling it something like that is sickening!
Thats not entirely true.Its being subsidized for the relief of common man.Any one can now travel from saddar to pak secretariat in just 20 rs .
 
.
Thats not entirely true.Its being subsidized for the relief of common man.Any one can now travel from saddar to pak secretariat in just 20 rs .
Which is good...But economically speaking it is putting a dent on the financial conditions of the country!
 
.
Which is good...But economically speaking it is putting a dent on the financial conditions of the country!
2 billion subsidy per annum cant do much to damage the economy.....Though i agree that we had more important issues to solve than building metro buses.....but still whats done is done.there is no going back now
 
.
The hacker should appreciate electricity board. They gave him enough power/time to run his system to hack the website:partay:.
 
.
Back
Top Bottom