Reichmarshal
FULL MEMBER
- Joined
- Jan 19, 2006
- Messages
- 1,154
- Reaction score
- 0
- Country
- Location
This is a surprise if true
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This is a surprise if true
Not sure of any credentials of this particular one but most “Defense” Vlog’s in Pakistan are made with unverified sources at best and wishful opinions at best.It was indeed unexpected, and when I viewed this VLOG yesterday, I prompted the commenter to provide any kind of video or image to substantiate his claim.
much needed upgrade
4 x F22P upgraded
4 x Type 054A/P
4 x Milgem
4 x Jinnah Class based don I-Class?
2 x OPV @1,900 tons
2 x OPV @ 2,600 tons
also we have the 1 x Alamgir Class
thats 21 advanced surface warships
Currently only two Jinnah class are planned as far as available information is concerned.
Considering the economic conditions, I don't see follow-on orders of JCF seeing the light of day.
The names mentioned here were tentative and no longer correct.
dumb video lol
This is a surprise if true
I must say, its load of non-sense.
This is a surprise if true
Whatever Admiral Abbasi said can be split into two sections:If we review ex-chief interview's acquisition plan for PN, things are heading almost on the same path i.e.
04 FFGs (054A/P) - Completed
10 MPAs (Sea Sultan) - On going
08 SSKs (039C) - On going
20 Patrol Crafts (Swift Class) - On going
02/02 OPVs (Damen) - Completed/On going
And all of the aforementioned projects have either been completed or are now in progress with the same oversaturated economy.
Therefore, it won't be difficult to accept that 6 to 8 Jinnah class FFGs won't be accomplished, especially after all of the preparation work has been done (design, armament package, sensor suites, etc.), and make little sense to such a strenuous exercise for only 2 units.
Sir what is your take on P-282 Ballistic Missile ?I must say, its load of non-sense.
Different packages have been proposed regarding MLU of F-22Ps. Economics, availability, and compatibility will decide which package will be adopted. (if not short-listed already)
Whatever Admiral Abbasi said can be split into two sections:
1: Near-term and ongoing projects
2: Long-term and futute projects
Near term and ongoing projects like OPV-2200/2600, Type-054 A/P, Milgem-P, RAS-72 are materializing as per plan.
But some variations (good and bad) have been made in Sea-Sultan, Helicopters, Drones, FACs, FACMs, F22P MLU, JCFs, and "other things".
Do you have the reference that confirms 10 Sea Sultan are to be procured specifically?10 MPAs (Sea Sultan) - On going
Whatever Admiral Abbasi said can be split into two sections:
1: Near-term and ongoing projects
2: Long-term and futute projects
Near term and ongoing projects like OPV-2200/2600, Type-054 A/P, Milgem-P, RAS-72 are materializing as per plan.
But some variations (good and bad) have been made in Sea-Sultan, Helicopters, Drones, FACs, FACMs, F22P MLU, JCFs, and "other things".
Therefore, it won't be difficult to accept that 6 to 8 Jinnah class FFGs won't be accomplished, especially after all of the preparation work has been done (design, armament package, sensor suites, etc.), and make little sense to such a strenuous exercise for only 2 units.
Do you have the reference that confirms 10 Sea Sultan are to be procured specifically?