What's new

Made in Pakistan

xyx007

SENIOR MEMBER
Joined
Nov 27, 2017
Messages
3,340
Reaction score
1
Country
Pakistan
Location
Pakistan
MADE IN PAKISTAN
Pakistan's contribution to the Large Hadron Collider (LHC) - the world's largest and most powerful particle collider, the largest and most complex experimental facility ever built, and the largest single machine in the world - situated at the underground CERN facility in Switzerland and France. A high-rate Resistive Plate Chamber (RPC) installed in the LHC, which was designed jointly by the Pakistan Atomic Energy Commission (PAEC) and the National Centre for Physics (NCP), Islamabad, and manufactured at the Heavy Mechanical Complex (HMC), Taxila, Pakistan. Out of a total of 300 RPCs installed in the LHC, 245 (plus 43 spares) were manufactured in Pakistan. Pakistan won the contract for 288 RPCs by beating competitive
col1.jpg
 

Attachments

  • col2.jpg
    col2.jpg
    31.4 KB · Views: 48
.
I Think A Thread Is Already Running On This
 
.
MADE IN PAKISTAN
Pakistan's contribution to the Large Hadron Collider (LHC) - the world's largest and most powerful particle collider, the largest and most complex experimental facility ever built, and the largest single machine in the world - situated at the underground CERN facility in Switzerland and France. A high-rate Resistive Plate Chamber (RPC) installed in the LHC, which was designed jointly by the Pakistan Atomic Energy Commission (PAEC) and the National Centre for Physics (NCP), Islamabad, and manufactured at the Heavy Mechanical Complex (HMC), Taxila, Pakistan. Out of a total of 300 RPCs installed in the LHC, 245 (plus 43 spares) were manufactured in Pakistan. Pakistan won the contract for 288 RPCs by beating competitive View attachment 580074


Such encouraging science and R&D news are never printed in mainstream media.

Thought Pakistan is contributing to CERN only in research and not critical manufacturing...



'A high-rate Resistive Plate Chamber (RPC) installed in the LHC, which was designed jointly by the Pakistan Atomic Energy Commission (PAEC) and the National Centre for Physics (NCP), Islamabad, and manufactured at the Heavy Mechanical Complex (HMC), Taxila, Pakistan. Out of a total of 300 RPCs installed in the LHC, 245 (plus 43 spares) were manufactured in Pakistan. Pakistan won the contract for 288 RPCs by beating competitors'
 
.
Back
Top Bottom