What's new

Lahore-- Updates...............

10/5/2018.
Walk & Shop Park (Arena) ...JOHAR TOWN. LAHORE


32290843_1649838625093680_7509375959116546048_n.jpg




32234363_1649838635093679_5850153663728713728_n.jpg




32130475_1649838645093678_3943303907903537152_n.jpg




32116700_1649838775093665_1606691100146270208_n.jpg




32227199_1649838738427002_9215305349538512896_n.jpg
 
Pakistan Kidney & Liver Transplant and Research Center.
Progress of PKLI's Second Phase.


33077441_444097792710599_2302224112719757312_n.jpg




33061326_444097789377266_7811830742966599680_n.jpg




33111394_444097772710601_3531352536319524864_n.jpg




33107383_444097782710600_1753615261258219520_n.jpg




33081622_444097839377261_4097844781198082048_n.jpg
 
Punjab Power Plant will add combined cycle production of 1263 MW to the national grid by 2019.


33306804_2043320909215034_8497012347485814784_n.jpg



The efficiency of 1263 MW Punjab Power Plant is 61.16%.


33364893_2043317102548748_8362582366497013760_n.jpg
 
PM to perform groundbreaking of Shahdara bridge today

Lahore.... Prime Minister Shahid Khaqan Abbasi will lay the foundation stone of a six-lane overhead bridge at Imamia Colony Railway Crossing Shahdara Lahore on Friday (today). The project starts at Shahdara and ends approximately 4.4 kilometres south of Kala Shah Kaku Interchange. The total length of the project is 1.7-kilometre and is consisted of the construction of the railway overhead bridge, approach ramps, service roads and two pedestrian crossing bridges, said the NHA. The NHA said the project will cost around Rs 2 billion. The bridge will facilitate an uninterrupted flow of traffic on GT Road (N-5) at Imamia Colony near Shahdara and will eliminate the existing congestion and delays. It will also provide an alternate route to the traffic emanating from Shahdara and heading to Lahore.

The fast and direct route will save travel time and fuel consumption and ensure enhanced safety for the road traffic as well as train operations, the NHA said.

The Nation
STAFF REPORT - May 25, 2018
 
Arena Walk & Shop Project 23 May


33147964_1662737160470493_3371480723847380992_n.jpg


33144996_1662737117137164_5979527957109014528_n.jpg


33401232_1662737040470505_6352059212612239360_n.jpg


33426438_1662736963803846_5352977174485794816_n.jpg


33343107_1662736970470512_1816634886895697920_n.jpg
 
Updates 4/6/2018.

34346964_1674988292578713_3359008387927900160_n.jpg






34304793_1674988552578687_8312256963379462144_n.jpg


34387300_1674988595912016_322864597289664512_n.jpg




34321841_1674988939245315_1775853691383840768_n.jpg


34415042_1674989069245302_776108097990033408_n.jpg


34323964_1674989132578629_7046052277546647552_n.jpg


34419182_1674988112578731_8744665947094122496_n.jpg


34481830_1674988152578727_1215191980573720576_n.jpg


34308319_1674988172578725_5703502894465024000_n.jpg
 
Package -1 , near Dera Gujjran Station.


34787941_1686719094746514_3880588327295909888_n.jpg




34606686_1686719831413107_4126471837737549824_n.jpg




34560789_1686719144746509_5701762655321063424_n.jpg


34699650_1686719124746511_6024895872750321664_n.jpg



Package -1 , Central Station.


34631417_1686717171413373_1086232112882778112_n.jpg


34823281_1686717141413376_1679922032004825088_n.jpg




Package -1 , Anarkali Station.

34582824_1686718118079945_181428369294884864_n.jpg


34741801_1686718318079925_6053043576579817472_n.jpg


34601687_1686718288079928_2092757196189204480_n.jpg


34595778_1686718338079923_7553039554425389056_n.jpg
 
Sialkot-Lahore Motorway

LAHORE EASTERN SIALKOT BYPASS NEAR MEHMOOD BOOTI INTERCHANGE






LAHORE SIALKOT BYPASS BRIDGE OVER RING ROAD MEHMOOD BOOTI









Updates 5/6/2018.

34788259_631048373916161_5064303974320963584_n.jpg



34581760_631047857249546_6393716448308494336_n.jpg
 
Askari Tower in Lahore topping out at about 200 feet! Building completed in a record time.


34138233_1033419840145316_4465047867777613824_n.jpg
 
Updates 9/7/2018.

1_960x540.jpg





36826265_1723896297687912_185141274032996352_n.jpg


36826297_1723892054355003_2587944879350874112_n.jpg


36828240_1723895154354693_6313391162484850688_n.jpg


36844538_1723893471021528_7056906213954420736_n.jpg


36847975_1723893857688156_858195454276403200_n.jpg


36851936_1723896054354603_7554957356107300864_n.jpg


36857623_1723892121021663_5742606522995703808_n.jpg


36860789_1723892684354940_6014621112682414080_n.jpg




36882479_1723896391021236_9194529360072146944_n.jpg
 
36543833_10156952111163968_866685329015308288_n.jpg


People are calling this a new waterfall in Lahore courtesy Shahbaz Sharif
lol.gif


Seriously though that is a massive sink hole and incredibly dangerous. I hope they can fix this soon and make sure the work that goes on is top of the line quality.


Sink hole at mall road repaired in less than 24 hours. Good work must also be appreciated.







Construction of Flyover at Shaukat Khanum Intersection, Lahore updated pictures.

36607656_1725509884200768_7542948481518796800_n.jpg




36629599_1725509857534104_8191918031354462208_n.jpg


Latest

37050828_1734191736665916_8006871783472889856_n.jpg
 


I live in here when I am on vacations. There used to be so much traffic . Shukar Alhumdulillah for this flyover.
 
Walk & Shop Park Arena Under Construction in Johar Town. Lahore.

38218300_1604399546354404_8349962962307383296_n.jpg




38085770_1604399789687713_5986574177375617024_n.jpg




38177031_1604400046354354_1109540840268627968_n.jpg
 
Walk & Shop Park - ARENA (August 2018)


38180761_1759387947472080_7721646737672110080_n.jpg


38260561_1759387907472084_6070511831342907392_n.jpg


38260598_1759387670805441_1142231859288080384_n.jpg


38178369_1759387867472088_6725139626928898048_n.jpg


38085236_1759387810805427_3532335581319135232_n.jpg



38177079_1759387637472111_8221488619194417152_n.jpg




38264023_1759388080805400_198731748853415936_n.jpg
 
Back
Top Bottom