What's new

KP government funded 150 kW Micro Hydro Power Project completed

O Vow amazing 84 billion rupees (nandipur)and not a single bulb is lightening ,great achievement by NS and SS Great going PMLN.
Koi sharam hoti hai koi haya hoti hai, koi tehazeeb hoti hai
g g bilkul sb kuch hota hai lekin PMLN k liye ye kuch ni hota baki sb hota hai.
Bhai aap ki aankhon pr parda dala hai ya aap nay ziada he pee lee hai.
Go and check ur facts, nandipur bcomes operational 3 days ago and producing 240 MW, 2 turbines made on operational.
 
.
Koi sharam hooti hay koi haya hooti hay
nandi pur cost 89 billion .... FAIL
QA Solar plant cost 131Million $ .... production 12 MW :rofl:
Solar park has 100MW rated capacity, and it opeartes on full capacity during max Sunshine time.
I hope being a non engineer you dont know the technical terms like net power, rated power, availability factor and capacity factor.
So i better not waste my time on pti kids having no knowledge on capacity factor of solar plants.
 
.



More projects will be completed soon.


Under construction: Khyber Pakhtunkhwa Government funded Mini/Micro Hydro Power Projects (MHPs) 55 in total have been approved in only in Chitral as of Sep 2015 - Images taken Sep, Oct 2015. For August Report, please review on link > KP MHPs Progress Report (Aug 2015) ‪#‎KPKUpdates‬

1. Basti, Chitral 100 kW
2. Kochgah, Chitral 20 kW
3. Akroi Arandu, Chitral 75 kW
4. Dinsk, Chitral 30 kW
5. Shershal, Chitral 50 kW
6. Gobore Bakh, Chitral 50 kW
7. Burbunu, Chitral 50 kW
8. Basit, Chitral 100 kW
9. Moroi Payeen, Chitral 50 kW
10. Broom Bumburate, Chitral 150 kW
11. Grambith Gole, Kalash Valley 75 kW
12. Booni Gol, Chitral 100 kW
13. Ashirate, Chitral 50 kW

12088154_1215056225203462_2907276311741473139_n.jpg


11250085_1215056215203463_5030151938540144651_n.jpg


12144832_1215056218536796_4920097856673232341_n.jpg
Hahah
10 mini dams will produce less than 1MW.
 

Attachments

  • 1445678890304.jpg
    1445678890304.jpg
    16 KB · Views: 34
.
Go and check ur facts, nandipur bcomes operational 3 days ago and producing 240 MW, 2 turbines made on operational.
yes, of course, but on trail bases with 42 rupees/unit cost.

Solar park has 100MW rated capacity, and it opeartes on full capacity during max Sunshine time.
I hope being a non engineer you dont know the technical terms like net power, rated power, availability factor and capacity factor.
So i better not waste my time on pti kids having no knowledge on capacity factor of solar plants.
OMG yes it produces 80 MW only for two to three hours during summer and on average it produces 15 to 20 MW.
u better get your facts right and then comment.

Hahah
10 mini dams will produce less than 1MW.
but u c it is better than money wasting by NS and SS on some stupid solar and nandi pur.
Oh but i forgot that u cant c the blunders of ur leaders.Good Kee it up.
 
. .
yes, of course, but on trail bases with 42 rupees/unit cost.
Stop trolling dear, the figurws you are quoting are of feb 2015. Your facts and figures are out dated.

OMG yes it produces 80 MW only for two to three hours during summer and on average it produces 15 to 20 MW.
u better get your facts right and then comment.
Solar plants around the world has capacity factor of 18 % and Quaid E Azam solar park has 18.5%.
Stop crying like typical ptian.
 
. .
keep your Trolls aside and learn to appreciate the works of Both Provincial and Federal...
 
.
Stop trolling dear, the figurws you are quoting are of feb 2015. Your facts and figures are out dated.


Solar plants around the world has capacity factor of 18 % and Quaid E Azam solar park has 18.5%.
Stop crying like typical ptian.
So if it is producing 18 MW out of 100, exactly that what i was saying not trolling.
I m laughing at u, not crying.
what a wise man u r.:partay::partay:
 
. . .
thn out of those 900kw
less thn 100kw would be obtained in the seqsons other thn summer kids
 
.
Bhai ab Shahbaz Shareef ki trha lakhon caroro rupay advertisement pr kharch krna paray gein is media ki tawaja hasal kranay k liye.


Yr, I am not talking about media advertisements, but at least media should have covered this great development like they do every time in Punjab even for a failed project like Nandi Pur.
 
.
how much is it actually producing, 900kW is the max capacity
 
.



More projects will be completed soon.


Under construction: Khyber Pakhtunkhwa Government funded Mini/Micro Hydro Power Projects (MHPs) 55 in total have been approved in only in Chitral as of Sep 2015 - Images taken Sep, Oct 2015. For August Report, please review on link > KP MHPs Progress Report (Aug 2015) ‪#‎KPKUpdates‬

1. Basti, Chitral 100 kW
2. Kochgah, Chitral 20 kW
3. Akroi Arandu, Chitral 75 kW
4. Dinsk, Chitral 30 kW
5. Shershal, Chitral 50 kW
6. Gobore Bakh, Chitral 50 kW
7. Burbunu, Chitral 50 kW
8. Basit, Chitral 100 kW
9. Moroi Payeen, Chitral 50 kW
10. Broom Bumburate, Chitral 150 kW
11. Grambith Gole, Kalash Valley 75 kW
12. Booni Gol, Chitral 100 kW
13. Ashirate, Chitral 50 kW

12088154_1215056225203462_2907276311741473139_n.jpg


11250085_1215056215203463_5030151938540144651_n.jpg


12144832_1215056218536796_4920097856673232341_n.jpg

Good job, but this is too insignificant to have its own thread
 
.

Pakistan Defence Latest Posts

Country Latest Posts

Back
Top Bottom