aman_rai0007
BANNED
- Joined
- Jul 9, 2017
- Messages
- 290
- Reaction score
- -4
- Country
- Location
Weather Tejas was started in 83 or 93 it doesn't matter.
What matters is that it is able to replace mig 21 anyday. We don't require Tejas as our frontline aircraft.
What matters is iaf is getting the full fledged aircraft from day one in the inventory.
Yes we are short on numbers but we are on the right track to fullfill it.
Rest everything is just an attempt to mislead the thread nothing else.
You went as far as blk5 even though blk3 is still on paper...
Your blk3 is on the same level as mk2
And for your information mk1a will enter production as soon as 40 mk1 will be delivered...
And paf achieved it's so called target because it inducted a half baked plane just to increase the number.
You should remember that lca is not frontline aircraft of IAF but jf has to be the frontline aircraft of paf , so we are not in any hurry we have other superior aircraft to deal with paf.
What matters is that it is able to replace mig 21 anyday. We don't require Tejas as our frontline aircraft.
What matters is iaf is getting the full fledged aircraft from day one in the inventory.
Yes we are short on numbers but we are on the right track to fullfill it.
Rest everything is just an attempt to mislead the thread nothing else.
Prove me wrong... Else shut upBS argument. Must have been invented by some LCA fanboy to sleep well at night.
Why don't you think realistic...What you are talking about is still not available in LCA its self and MK1a is far way from IAF reach and need another 3 to 4 years at least where as block 3 will be operational by next year and our up gradation program for block 1 and 2 will be progress simultaneously. IAF production line its self busy for next 3 year so don't talk big and be realistic. In real world PAF achieved her target on jf17 and LCA is still in lots of dark clouds over her. Our block 4 is now on drawing board if we are planning for that. So by the time lca1a start production our block4 entering PAF. As far as i thick JF17 will go upto block 5 and then we have 5th gen fighter
You went as far as blk5 even though blk3 is still on paper...
Your blk3 is on the same level as mk2
And for your information mk1a will enter production as soon as 40 mk1 will be delivered...
And paf achieved it's so called target because it inducted a half baked plane just to increase the number.
You should remember that lca is not frontline aircraft of IAF but jf has to be the frontline aircraft of paf , so we are not in any hurry we have other superior aircraft to deal with paf.