What's new

Italian MoD takes delivery of first non-US built F-35B

Zarvan

ELITE MEMBER
Joined
Apr 28, 2011
Messages
54,470
Reaction score
87
Country
Pakistan
Location
Pakistan
1633134_-_main.jpg

The first non-US built F-35B was handed over to the Italy's Ministry of Defence on 25 January. Source: Lockheed Martin

The first Lockheed Martin F-35B Lightning II Joint Strike Fighter (JSF) to be built outside of the United States was handed over to the Italian Ministry of Defence (MoD) on 25 January, it has been announced.

The short take-off and vertical landing (STOVL) fighter was assembled at the Final Assembly and Check Out (FACO) facility at Cameri in Italy ahead of its eventual delivery to the Italian Navy. Previously, a number of non-US conventional take-off and landing (CTOL) F-35A aircraft have been built at Cameri and at Nagoya in Japan.

Italy has a requirement for 30 F-35Bs (15 each to be operated by the Italian Air Force and the Italian Navy) and 60 F-35As. The first test, evaluation, and training F-35A was delivered to the air force in December 2015, with the final JSF scheduled to be handed over in 2027.

To date, nine F-35As and one F-35B have been delivered from the Cameri FACO. Four of these jets are now based at Luke Air Force Base, Arizona, for international pilot training, and five are at Amendola Air Base in Italy.

Want to read more? For analysis on this article and access to all our insight content, please enquire about our subscription options at ihs.com/contact




To read the full article, Client Login
(205 of 367 words)

http://www.janes.com/article/77420/italian-mod-takes-delivery-of-first-non-us-built-f-35b
 
.
Back
Top Bottom