What's new

ISRO Ion-Propulsion Update ;)

. .
GSAT 19 is where it will be used :flame:
1.5 to 2 Tonnes weight reduction.
@Chanakya's_Chant @SOHEIL
@Chanakya's_Chant
When is GSAT 19 scheduled for launch

Thanks a lot bhai! To be particular it's GSAT-19E - a communication satellite weighing about 3500 Kgs to be launched on-board the first full-flight of GSLV Mk III/LVM3 vehicle (LVM3-D1) scheduled for December 2016. GSAT-19 will carry 3 Ka-band, 2 C-band and 2 MSS transponders. INR 1 crore had been sanctioned for GSAT-19E communication satellite in Budget 2014-15 for preliminary design and development work of the same - work is already on! :tup:

ISRO to conduct test flight of heavy capacity launcher by 2016: Expert
 
.
Thanks a lot bhai! To be particular it's GSAT-19E - a communication satellite weighing about 3500 Kgs to be launched on-board the first full-flight of GSLV Mk III/LVM3 vehicle (LVM3-D1) scheduled for December 2016. GSAT-19 will carry 3 Ka-band, 2 C-band and 2 MSS transponders.

ISRO to conduct test flight of heavy capacity launcher by 2016: Expert
Hmm.............
So according to the video , Ion Propulsion has been "tried", and will be deployed on GSAT 19 so we are a year and a half away I guess.
That's NICE.... we need more manpower so that we can grab , apart from launching contracts , satellite manufacturing contracts as well....
BTW 3500 is with or without Ion?
Lightest Satellite manufacturer + Lowest launch cost (RLV) = Market leader. ;)
 
.
For beginners - Ion propulsion is a technology that involves ionizing a gas to propel a craft. Instead of a spacecraft being propelled with standard chemicals, the gas xenon (which is like neon or helium, but heavier) is given an electrical charge, or ionized. It is then electrically accelerated to a speed of about 30 km/second.

futureapps.jpg

moteur-ion-eng-1.png

102690main_ion_thruster_diag_516x366.jpg

Hmm.............
So according to the video , Ion Propulsion has been "tried", and will be deployed on GSAT 19 so we are a year and a half away I guess.
That's NICE.... we need more manpower so that we can grab , apart from launching contracts , satellite manufacturing contracts as well....
BTW 3500 is with or without Ion?
Lightest Satellite manufacturer + Lowest launch cost (RLV) = Market leader. ;)

3500 kg. includes it's propulsion system that is Ion propulsion system!

 
.
For beginners - Ion propulsion is a technology that involves ionizing a gas to propel a craft. Instead of a spacecraft being propelled with standard chemicals, the gas xenon (which is like neon or helium, but heavier) is given an electrical charge, or ionized. It is then electrically accelerated to a speed of about 30 km/second.

futureapps.jpg

moteur-ion-eng-1.png

102690main_ion_thruster_diag_516x366.jpg



3500 kg. includes it's propulsion system that is Ion propulsion system!

Quality post and Excellent info @Echo_419 kuch seekh
 
.
First Prototype of ISRO's Semi-Cryogenic Engine To Be Ready By 2016

Trips to Venus & Asteroids also being studied.

Indian Space Research Organisation [ISRO], Mr AS Kiran Kumar, visited the Inter-University Centre for Astronomy and Astrophysics [IUCAA] yesterday, where he delivered an hour-long talk. Titled, "Space Exploration - An Indian Perspective", he primarily spoke about its work in the field of Astronomy, including relevant payloads ISRO satellites, launched so far, have carried on-board. For the 1st time, next month, it would be launching a satellite dedicated to the study of Astronomy. The Astrosat satellite, to be launched aboard the PSLV-C34 mission, is currently in the process of being mated to the launcher, he informed.




During the Q&A session that followed, when asked, he confirmed that development of India's Semi-Cryogenic Engine [SCE] is, "in a very advanced stage". He added that demonstration of the engine could take place, "within a matter of 1 year". There is, however, a need to build test-facilities for the engine, which is taking time, he said. It is looking to work around this issue by exploring, "alternate ways of doing the test using facilities which are existing elsewhere". Translated, ISRO would want to carry out its ground tests outside the country, quite like the way GTRE does with the Kaveri engine's flight testing in Russia, aboard its modified Il-76 test-bed.

Semi-cryogenic engine is 1 where where either element in the propellant - fuel & oxidiser, can be operationally stored at room temperature. The engine ISRO is developing - SCE-200, would use liquefied oxygen & ISROSENE [aviation-grade kerosene], & generate 2000kN of thrust in vacuum. Kerosene, being economical & liquid at room temperature, would simplify handling, generating higher thrust cost-effectively. It envisages use of SCE as the 1ststage of its heavy-lift Unified modular Launch Vehicle [ULV], as also the lighter Two Stage To Orbit [TSTO]Reusable Launch Vehicle [RLV]. In the interim, 1 SCE-200 could be used as the 2nd-stage, SC160, in the GSLV Mk. III, replacing the current L110, that uses 2 Vikas Engines. It would then be capable of placing a 6.2MT payload [vs. 4 MT] into GTO.

ISRO would test use of Ion thrusters on the GSAT-19 satellite, he said. The thrusters would primarily be used to stabilise the satellite in Space. It would be the 2nd ISRO satellite to use electric propulsion, the first being the GSAT-4 satellite that was being carried on-board the unsuccessful GSLV-D3 mission. Thus, the satellite never got deployed. Successful demonstration of Ion Propulsion would enable ISRO to, "substantially reduce the weight of the satellite, for the same function & capability", translating to weight saving, "almost to the tune of 1.5-2MT", he said.


It plans to launch the GSAT-19 [also referred as GSAT-19E] aboard the 1st demonstration flight of GSLV Mk. III, the GSLV Mk-III D1, scheduled for 2016-2017. The satellite would carry:

In addition, it would, "act as a test bed for development of advanced spacecraft technologies and bus subsystem experiments like New modular I-6K Structure, Electrical propulsion System, Active thermal control using deployable thermal radiators, Motorised deployment of solar panels, miniaturised IRU, indigenous Li-ion battery,2 KW BDR, indigenous C-Band TWTA, etc., for future I-6K Bus".



Future missions could include trips to the planet Venus & Asteroids, he added. ISRO has initiated studies to explore feasibility of undertaking missions to the aforementioned destinations, in addition to re-visiting Mars, this time with more payload, with the availability of heavier GSLV-series launchers.

An unassuming man, he wore a pair of white sports shoes, to go with his blazer, shirt & trouser ensemble.

First Prototype of ISRO's Semi-Cryogenic Engine To Be Ready By 2016 - AA Me, IN
 
. . .
@mike2000 is back --- maybe you should buy this from us. We'll give discount considering the backward status of UK space program.....(actually non-existant status)
 
. .

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom