What's new

Infrastructure Development in Pakistan

Gloria Jeans, Dolmen Mall Clifton, Karachi.

Gloria-Jeans-Coffee-Dolmen-Mall-Clifton-Bloggers-Meet-up-(6).jpg


Gloria-Jeans-Coffee-Dolmen-Mall-Clifton-Bloggers-Meet-up-(5).jpg


Gloria-Jeans-Coffee-Dolmen-Mall-Clifton-Bloggers-Meet-up-(9).jpg


Gloria-Jeans-Coffee-Dolmen-Mall-Clifton-Bloggers-Meet-up-(14).jpg


Gloria-Jeans-Coffee-Dolmen-Mall-Clifton-Bloggers-Meet-up-(15).jpg

Gloria-Jeans-Dolmen-Mall-Clifton-Karachi-(3).jpg



Gloria-Jeans-Dolmen-Mall-Clifton-Karachi-(6).jpg



Gloria-Jeans-Dolmen-Mall-Clifton-Karachi-(9).jpg
 
Karachi, Pakistan - 20th May, 2012 Arabian Nights held the launch ceremony of their second venture under the name of “Arabian Nights Lounge” in a royal way. With the whole event thematically decorated with the theme of Arabia from the tastefully decorated surroundings, to the costumed ushers, dance performances, right up to the fireworks; all was deliciously crafted by Food Connection Pakistan, with Mr. Khurram A Khan being the chief Organizer.

anc4.jpg


anc7.jpg


anc5.jpg


anc8.jpg


anc2.jpg

Arabian-Nights-Lounge-Clifton-Karachi(14).jpg



Arabian-Nights-Lounge-Clifton-Karachi(17).jpg
 
Hyderabad: Boulevard Mall

578227_389838584389306_205822776124222_1165812_227566640_n.jpg


Hero Construction Ltd is bringing Luxury Shopping Mall, which will have unlimited access of both local and international brands with sound entertainment which will provide the ultimate joy for whole the family.

About
Hero Construction Ltd is bringing Luxury Shopping Mall, which will have unlimited access of both local and international brands with sound entertainment which will provide the ultimate joy for whole the family.
Mission
The builder’s reputation can be imagined with this fact, that the company has completed many luxurious & highly modern buildings and plazas. Our pledge is to establish lasting relationships with our customers by exceeding their expectations and gaining their trust through exceptional performance by every member of the construction team.
Description
Our motto is Commitment, a trait that all teams and its members must possess.

At Hero we believe in quality, honesty and hard work. We consider our staff as our asset. Our stress on commitment and team work have led us to select a choice team of engineers, planners, architects, financial consultants, preconstruction experts and construction managers. They are known for their previous projects in construction of buildings and plazas of international quality and standard.

At Hero, our philosophy is Think global build local..
General information
The newest symbolic icon in Hyderabad from Hero Construction. It’s more than a shopping mall with well equipped Cinemas featuring the latest 3D technology, bowling alley with latest equipment's and a great food court that offer many kinds of cuisine for food lovers. With Verity of International brands for shopping, an underground parking space for family convenient.


Rawalpindi: A New Office Building in Commercial Market.

7308507016_a3166293e0_c.jpg

7308514430_39352ba449_c.jpg



Lahore: Gulberg Galleria

gg-001.jpg
 
LAHORE| Bus Rapid Transit system


428979_369845126382251_100000703001331_1115729_1299141732_n.jpg


422452_369844873048943_100000703001331_1115726_169682159_n.jpg


1101450302-1.jpg


2hmfxpk.jpg


p2-04.jpg


6843010058_6fe310e547_b.jpg


360405-Bus-1333662186-732-640x480.jpg

Bus Rapid Transit System: Govt pushes ahead with construction work

384667-DevelopmentprojectPHOTOMOHAMMADNOMANEXPRESS-1338094586-618-640x480.jpg

TEPA official says project to be finished in six months. PHOTO: MOHAMMAD NOMAN/EXPRESS


LAHORE: The Punjab government has decided to launch work on all remaining sections of the Bus Rapid Transit System (BRTS) and hope to finish the project in six months, The Express Tribune has learnt.

The project to build a double bus-only lane down the centre of Ferozepur Road from Youhanabad to Shahdara at a cost of Rs22 billion has been divided into six packages. Work on the 10.1-kilometre package 1, from Youhanabad to Kalma Chowk, is to be completed in one month, said Traffic Engineering and Planning Agency (TEPA) officials.

A company was selected to work on the 4.9-km package two, from Kalma Chowk to Qurtaba Chowk, about a week ago and it has set up a site office. The plants on the green belt on Ferozepur Road from Kalma Chowk to the Muslim Town flyover have been removed.

Tenders for packages three and four, which will consist of a 4.1-km elevated lane from Qurtaba Chowk to Data Darbar, are to be issued in three days, while tenders for packages five (Data Darbar to Niazi Adda, a distance of 2.5 km) and six (a 5.5-km stretch from Niazi Adda to Shahdara) are also to be allotted within a week, said officials.

The Planning and Development Department has approved the elevated lane to be built in packages three and four. An official said that the Old Ravi Bridge would serve as the BRTS lane for package five and would be closed to general traffic.

Former Lahore Development Authority director general Sibtain Fazal-i-Haleem has been made the project director for the entire BRTS. TEPA Director Mazhar Hussain Khan is project director for packages one and two, TEPA Director Israr Saeed for packages three and four, and Deputy Chief Engineer Saifur Rehman for packages five and six.

Officials connected with the project said that they were currently deciding what land purchases would be necessary for the BRTS route. They said that large amounts of land would be required for packages two, three and four and they anticipated protests in some cases.

An official said that three to ten feet of land from the edge of the road would be required at Ichhra, and around 21 feet at Shama on Ferozepur Road. Land would also have to be bought from the Old Hailey College for package three.

He said that several shops would have to torn down at Qurtaba Chowk, and many shops on one side of Lytton Road. Shops at the corner of Lake Road would also have to be demolished. He said that the construction of packages five and six would be simpler and did not require extensive land acquisition.

TEPA Planning Director Khalid Mehmood Alvi said that it was a good idea to start work on the entire project at once. “It will mean finishing in the shortest possible time and I think the project will be completed in six months or so,” he said.

It would also mean that the project is finished while the PML-Nawaz remains in the government, so that a successor government could not shelve it, he added.

Published in The Express Tribune, May 27th, 2012


Bus Rapid Transit System: Govt pushes ahead with construction work – The Express Tribune
 
good to see that pakistan is developing fast and trying to catch up with major BRIC economies like CHINA and INDIA....
chase.gif

http://*************.net/flag-smiley-7331.gif
 

Back
Top Bottom