What's new

Infrastructure Development in Pakistan

.
Latest Pictures of 150 MW Patrind Hydropower Project. Located in Muzaffarabad..


78357922_2368248476636170_6790640072921186304_n.jpg




76903808_2368248626636155_1912123584822640640_n.jpg
 
. .
Govt moves summary for revival of Tuwairqi Steel Mills

Amid serious reservations of the local steel industry, the government has planned to revive Tuwairqi Steel Mills Limited (TSML), as a summary in this regard has been submitted to the Economic Coordination Committee (ECC) for approval.

TSML, a joint foreign direct investment (FDI) project by Saudi Arabia’s Al-Tuwairqi Group of Companies and a South Korean firm, was established at Bin Qasim, Karachi, over an area of 220 acres. The Saudi firm had stopped its work on the plant after the Pakistan Muslim League-Nawaz (PML-N) government had refused to provide gas at a discounted rate.

The initial plan for TSML was to make it the largest steel complex in Pakistan, having a production capacity of 1.28 million tonnes per annum. It’s Direct Reduced Iron (DRI) plant was shut down for several months in 2014 due to the dispute over gas supply. The first phase of the DRI plant was completed at a cost of $340 million, while the capital injection in phase-II and III was expected to be in the range of $850 to $900 million


 
.
The Saudi firm had stopped its work on the plant after the Pakistan Muslim League-Nawaz (PML-N) government had refused to provide gas at a discounted rate.


Kuttay ke bachay were more loyal to their own pockets than the country. That is why every Noora and their supporters need to be sent before a firing squad.
 
. . .
Recently made fly over on intersection of Tipu Sultan & Shaheed e Millat Road, Karachi. The flyover has been named after Begum Raana Liaquat Ali Khan, wife of 1st PM & also the 1st female Governor of a province in

79530875_2390461627748188_619618885796102144_o.jpg
79696026_2390461747748176_2907756493627457536_o.jpg
77276019_2390461917748159_1781242131583598592_o.jpg


Shaheed e Milat underpass Karachi

78861739_2390319894429028_5733947130192592896_n.jpg
78787386_2390319967762354_1192751708460023808_n.jpg
78666330_2390320071095677_2852789759871287296_o.jpg
 
.
4 lanes Kallur Kot Indus River Bridge Grider launching work underway by GRC

1.25 km 4 lanes bridge with access road at Indus river connecting Kallur Kot Bhakkar with D I Khan.It will link Kallur Kot with Dhakki area 80 km travelling reduced in 15 km .CPEC Western Route Yarik & Abdul khel Interchanges of 285 km D I Khan Islamabad Motorway linked with Punjab .It will link Indus Highway N-55 with Mianwali Multan MM Road.It will be a new link between KPK and Punjab .Dera Ismail Khan Sargodha travelling time reduced more than 2 hours.
Photo Credit:Waheed Khan










__________________
 
. .
The Sindh government and the World Bank have agreed to launch a $200 million Solid Waste Emergency and Efficiency Project (SWEEP) for improvement and removal of waste from streets, drainage channels and canals in the metropolis #Karachi.

This decision was taken in a meeting Chief Minister Syed Murad Ali held with World Bank delegation led by Catalina Marulanda, practice manager of the Urban Development Unit in the South Asia region

The other delegation members were Lixin Gu, programme leader, Sustainable Development and Suhaib Rasheed, urban specialist.

The chief minister was assisted by relevant officials.

Mr Shah said that an ADP [Asian Development Bank] scheme of Rs1.6 billion had been launched to improve solid waste management disposal in the city but “we are keen to do this on scientific manner and convert it into waste to energy”.

The World Bank offered the $200m SWEEP scheme to improve collection and removal of waste from streets, drainage channels and canals.

Under the plan garbage transfer stations in every district and its disposal at landfill site would be developed to generate energy
 
. . .
Rashakai Special Economic Zone, M1, KP

KPK Govt making preparations for its ground breaking ceremony sometimes early Jan 2020.
The SEZ is one of the prioritised SEZs under CPEC, and over an area of 1000 acres. The works has been awarded to a Chinese Firm namely CRBC.


79452365_2417301238397560_7775005135024947200_n.jpg
 
.
Under Construction Phase-2 of South Asia Port Terminal - SAPT Deep Sea Terminal Karachi. The Project includes construction of Container Yard and Buildings of the Port.


80132464_2419123154882035_6739153190387712000_o.jpg





79678800_2419123664881984_8767430734051803136_o.jpg





80251284_2419123851548632_4121134786821488640_o.jpg
 
.

Country Latest Posts

Back
Top Bottom