What's new

Infrastructure Development in Pakistan

Mega G4 Co Karachi

04.jpg
164.jpg
165.jpg
10475116_690311601004251_77494719_n.jpg


Bahria Tower Karachi
IMG-20140402-00056_edited_marked_zpsc72751e9.jpg
 
Azadi Chowk, Lahore

DSC_7648-3814-800-600-80.jpg

DSC_7682-3815-800-600-80.jpg

DSC_7635-3813-800-600-80.jpg

DSC_7599-3812-800-600-80.jpg

DSC_7693-3816-800-600-80.jpg

DSC_7594-3810-800-600-80.jpg

DSC_7597-3811-800-600-80.jpg

DJI01006-3809-800-600-80.jpg
 
Multan BRT Project

Photo Credit: Sparkingway SSC


Project Consultant: Osmani & Company Pvt Ltd in association with ADK, Consulting Engineers, S.A
1zq61xg.jpg

ncl2cn.jpg


At-Grade Sation

fjjfwg.jpg


Elevated Station

1z3xnd2.jpg


Station Layout
2m6aauc.jpg
 
Chinese experts connect Neelum-Jhelum

ISLAMABAD: In a landmark development on Neelum Jhelum Dam project, Chinese experts on Monday connected the 10 kilometers long under ground tunnel coming from Jhelum river side with the tunnel connecting the power house with almost 100 percent perfection.

These experts completed the gigantic task of connecting the two tunnels with precision (only with minor difference of 6 centimeters) and celebrated the occasion with pride.The Chief Executive of Neelum-Jhelum hydropower project company, Gen (R) Mohammad Zubair, when contacted, confirmed that it was a great milestone in the history of the project.

It speaks about the Chinese geologists’ expertise is touching new hights and they are working here day and night to complete the state-of-art project which is of paramount importance.“We have crossed the Jehlum river bed through the completion of underneath 10 Kilometer long tunnel and connected with Addit-5 (tunnel connecting with power house), the CEO said.

“The precision connection of the two tunnels gains significance if kept in view the case of just 8.5 Kilometers Lowari tunnel. When the said small tunnel was dug from both sides and at the time of connection there was a huge difference of 1.5 Meters,” he recalled mentioning how wonderfully connection with precision has been made in the case of Neelum-Jehlum River.

Gen Zubair explained that 71% of the 48 Kilometers water tunnel has been excavated and with the working of high tech tunnel boring machines (TBMs), the excavation work has picked up pace.

The site of power house and transformers hall (both are under ground) has been 100% excavated. So much so, draft tubes in the power house site are being installed and three out of four have been put in.

At the dam site, CEO said the 74% construction work got completed and the site for de-sander has been 100% hollowed out and wherein concrete work is now speedily underway.However, the officials in the Ministry of Water and Power dealing with Neelum-Jhelum project are quite upset and express their apprehension that the construction work on project may get slowed down or halted as the construction company of the project has not been provided the amount of Rs14 billion so far.

Though Prime Minister Mohammad Nawaz Sharif has sanctioned the said amount to the Chinese construction company, but three weeks have elapsed and no amount has been delivered to the said company.

Chinese experts connect Neelum-Jhelum - thenews.com.pk

Transformer Hall excavation completed

9375_163521347161192_2015384562_n.jpg
 
Ground breaking of KBT sports/Education center Maandesh, DIR KPK

Bn_zgZtIgAAk3gr.jpg:large
 
Rawalpindi-Islamabad Metro

10540416_529631370470553_2049895596922872800_n.jpg

10592743_529631407137216_5723543311086396387_n.jpg

10524366_529633893803634_1445347186633717365_n.jpg

1901135_529633917136965_4122590087632931943_n.jpg

10525744_529633953803628_896786276202415834_n.jpg

10492103_529637237136633_5064927753779693480_n.jpg

1454873_529637247136632_1268712199458801631_n.jpg

14936_529660413800982_2721912634778549380_n.jpg

10538656_529660457134311_2382440228387031831_n.jpg

10307388_529660487134308_6952229292091015430_n.jpg
 
10599143_877020852325890_752071432095037370_n.jpg
 
National Flag Monument Park, Islamabad

IMG_20140808_WA0006.jpg

IMG_20140808_WA0010.jpg

IMG_20140808_WA0013.jpg

IMG_20140808_WA0011.jpg

IMG_20140808_WA0008.jpg

IMG_20140808_WA0012.jpg
 
Rawalpindi Metro

10471362_504214799722472_7770195203297242819_n.jpg

10565166_504214919722460_6369511410419815516_n.jpg

10590441_504214953055790_3111229134645447236_n.jpg
 
National Flag Monument Park, Islamabad

IMG_20140808_WA0006.jpg

IMG_20140808_WA0010.jpg

IMG_20140808_WA0013.jpg

IMG_20140808_WA0011.jpg

IMG_20140808_WA0008.jpg

IMG_20140808_WA0012.jpg

How is a park equivalent to development?
 
A Subway at Azadi Chowk, Lahore

2gtup81.jpg

10371371_355593557928675_8389060657111664973_n.jpg
 
Back
Top Bottom