angeldemon_007
SENIOR MEMBER
- Joined
- Nov 29, 2010
- Messages
- 5,298
- Reaction score
- 0
Indian Air Force clears Kaveri-Snecma draft turbofan engine technical specs...
Indian Air Force clears Kaveri-Snecma draft turbofan engine t... on Twitpic
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Is it the same 100 kn engine for MK2 ?
Looks to be...still waiting for official new on that
Is it the same 100 kn engine for MK2 ?
The new delays in Kaveri and AESA project is because now iaf and drdo has decided to develop an engine and aesa to be of the standards of a 5th gen aircraft (AMCA) and not the previous 4th gen model for tejas mk2.