ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 102,926
- Reaction score
- 106
- Country
- Location
East West Corridor :440 Km Multan-Qilla Saifullah Highway
Deep foundation excavation for 8 Steel Bridges
Project: (Rakhi Gajj – Bewata Section) of East West Road Improvement Proejct Package-1 (Sta 7 + 600 to Sta 19 + 500).It is financed by Japan
33 km hilly portion of the N-70's Rakhi Gaj-Khar-Bewata section will be widened and shorted through construction of 8 steel bridges. This will shorten the distance and travel time between Multan and Quetta.
Deep foundation excavation for 8 Steel Bridges
Project: (Rakhi Gajj – Bewata Section) of East West Road Improvement Proejct Package-1 (Sta 7 + 600 to Sta 19 + 500).It is financed by Japan
33 km hilly portion of the N-70's Rakhi Gaj-Khar-Bewata section will be widened and shorted through construction of 8 steel bridges. This will shorten the distance and travel time between Multan and Quetta.