ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 102,880
- Reaction score
- 106
- Country
- Location
Diversion Tunnels are being constructed at 4,320MW Dasu_Hydropower_Project by using Drill & Blast method. The dimensions of excavation section are 24.6m×27.3m at inlets & outlets while 20.4m×24.2m in main underground Tunnels.