ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 103,045
- Reaction score
- 106
- Country
- Location
110 Km Khuzdar-Basima Road ( N-30 ) under construction .
The project is located in District Khuzdar in Balochistan province
The project is construction of 2-lane highway from Basima to Khuzdar link Rattodero Gwadar Motorway M-8 / RCD Highway N-25 with Hoshab Surab Highway N-85. The project length is 110 km. Estimated Cost 19.19 Billion .
The project is located in District Khuzdar in Balochistan province
The project is construction of 2-lane highway from Basima to Khuzdar link Rattodero Gwadar Motorway M-8 / RCD Highway N-25 with Hoshab Surab Highway N-85. The project length is 110 km. Estimated Cost 19.19 Billion .