What's new

10,000MW expected in national grid by Dec 2017

Plants will run on imported coal untill such time that thar mines are developed enough to supply enough and constantly....

Karachi is also getting k2 and k3 with combined capacity of 2 giga watts
 
.
Can't you read?? it's 9600 Square Kilometers.... Pakistan total area is 196,096 square Kilometers :D :D Learn the difference between Kilometers and Square kilometers :D :D and then troll



Yaaar Please don't talk shit here you don't make sense

in the pic you can see the landscape of Coal power plant and the landscape... the Black area is the Coal deposit area where the coal is stored for use while other area remains as it it so go troll somewhere else


and if you are talking about That Landscape it gonna be look like this

Strip_coal_mining.jpg
Surface_coal_mine_detail,_Gillette,_Wyoming.jpg


In India it looks like this

pietrasik-coal-mining-00e.jpg

devastating-photos-of-indias-illegal-coal-mines.jpg
I know the difference between KM and SqKM but did the writer who wrote that piece knew?. I agree about the pics that is how coal producing places should look like. I keep hearing about the coal in Thar for so many years, but that place in the shown pics looks so pristine and clean so just wondering thats all...
 
.
I know the difference between KM and SqKM but did the writer who wrote that piece knew?. I agree about the pics that is how coal producing places should look like. I keep hearing about the coal in Thar for so many years, but that place in the shown pics looks so pristine and clean so just wondering thats all...

try to read again

An official from Thar Coal Mining Authority said that all preparations have been made for the inauguration of the country's mega-project, which comprises of 12 blocks on over 9,000 square km of Tharparkar district. Buried under this land lies an estimated 175 billion tones of coal.
 
.
There were alot of talks about coal bed methane. apart from 50MW prototype, has anything else been materialized or commissioned ?
 
.
u should ask Khawaja Asifa , Mia brother for input since they are saying it will not be possible

What i am against is secret deals , projects that will harm environment and mega projects which cant be used in few years.

Thank you for try and try harder now. Now about your statement

u should ask Khawaja Asifa. (Learn respect others, Its Asif not Asifa+ when you write something did you asked him?.
Don't be harsh)

Mia brother for input since they are saying it will not be possible ( Again its Mian brothers not Mama Mia brothers)

What i am against is secret deals (we are on same page)

projects that will harm environment and mega projects which cant be used in few years (anything which is not natural is harmful, but we have take adjust and minimize the damages)
 
.
try to read again

An official from Thar Coal Mining Authority said that all preparations have been made for the inauguration of the country's mega-project, which comprises of 12 blocks on over 9,000 square km of Tharparkar district. Buried under this land lies an estimated 175 billion tones of coal.


May be I need special reading glass probably... I seem to not able find what you are asking me to look far :) :) :)

" Copy and Paste as it is from your post "


K Electric Coal power Plant in Port Qasim Karachi
Under construction by K-Electric and China's Harbin Electric International

Hub Coal Power Plant
Under construction, In January 2015, HUBCO announced that it would set up 1,320MW coal-based power plants next to its thermal power station at Hub in Balochistan and gradually enhance coal based generation to 3,600MW

and Finally Thar

Thar's coal fields: mining for power


MITHI: Mining in Thar's 9,600 kilometre coal fields are gaining momentum after the arrival of experts from China.

After the arrival of China under the China-Pakistan Economic Corridor (CPEC), work on two blocks and particularly on Block II has picked up pace.

Source: https://defence.pk/threads/10-000mw...-grid-by-dec-2017.420236/page-4#ixzz3z9GGPw95
 
.
@OP

Can you make a list of all on-going power projects and put them in first post?
Its hard to review the whole thread everytime.

And the status of the on-going projects i.e how much % they are completed.

And what is the update on bhawalpur solar plant? How much is it producing right now?
It was off 100 MW but was producing somewhere around 14MW if i remember correctly.
 
.
Just to let the members know that during a luncheon meeting this week-end with an old friend from Islamabad; I came to know that GOP is offering guaranteed 20% return to private investors in the renewable energy projects. This gentleman is planning to invest a couple of million dollars in a 50 to 60 MW Wind Power project in Jhimpir wind corridor. The project is still in an embryonic stage as foreign funding is still being negotiated.
That's 18% Dollar IRR to be precise and that's not new, its available from IPPs onward.

Just to let the members know that during a luncheon meeting this week-end with an old friend from Islamabad; I came to know that GOP is offering guaranteed 20% return to private investors in the renewable energy projects. This gentleman is planning to invest a couple of million dollars in a 50 to 60 MW Wind Power project in Jhimpir wind corridor. The project is still in an embryonic stage as foreign funding is still being negotiated.
That's 18% Dollar IRR to be precise and that's not new, its available from IPPs onward.
 
.
Back
Top Bottom