What's new

Infrastructure Development in Pakistan

LAHORE | Signal Free Qainchi, Ghazi & Khaira Junctions

12344_334171643404200_1151987165608561472_n.jpg
10295751_334169626737735_7161366835244209012_n.jpg
10301424_334205843400780_4475961608401750066_n.jpg
10366258_334169616737736_4264806404573789563_n.jpg
10410632_334205803400784_8484354941561952543_n.jpg
10423752_334171900070841_1655556637531441125_n.jpg
10435031_334171113404253_146966477794249812_n.jpg
10455028_334170136737684_1699333155029457925_n.jpg
10455230_334171546737543_1579831612547182772_n.jpg
10462771_334171743404190_1178721078224595486_n.jpg
 
LAHORE | Signal Free Qainchi, Ghazi & Khaira Junctions

10464023_334170016737696_1402293159848530123_n.jpg
14221002948_9622725c7e_b.jpg
14221041910_53ae008e31_b.jpg
14221169817_3e6436ecbc_b.jpg
14221186897_b8bfe3cc9e_b.jpg
14404263481_344830ee78_b.jpg
14406501644_e7fea08aa2_b.jpg
14406511644_da07a04d72_b.jpg
 
Rawalpindi-Islamabad Metro Bus Project (Pindi Section)

14214200548_5104dc9502_o.jpg
14214262968_49c51017ac_o.jpg
14214276128_1b22189d0c_o.jpg
14214310768_02946d64d2_o.jpg
14214340389_307d21479b_o.jpg
14214342440_edbb724146_o.jpg
14214347259_e7d7245dee_o.jpg
14214455927_67caa88703_o.jpg
14214587207_94a05c869e_o.jpg
14377683406_ed654bed34_o.jpg
 
Rawalpindi-Islamabad Metro Bus Project (Pindi Section)

14377906736_9caaf4dcf6_o.jpg
14397561731_ebede1acdf_o.jpg
14397669851_24193b8c00_o.jpg
14399486512_4e4448aa56_o.jpg
14399889374_c1627cfc18_o.jpg
14399895604_9f8d9d8f26_o.jpg
14420993803_b3ba977688_o.jpg
14421033453_912c1693f9_o.jpg
14421088193_9a664c7a9b_o.jpg
p8_49.jpg
 
New Islamabad International Airport

1907698_306508016179615_4871422283196068013_n.jpg


1112130_13984330.jpg
1102255611-1.gif


Mareer chowk tunnel Rawalpindi


14214110979_9b36fa1273_o.jpg
14214135660_996e6c1e6d_o.jpg
14377589976_392d2760b5_o.jpg
14397340821_ebc0a57020_o.jpg
14399662194_d031eb6c7e_o.jpg
14400769775_637710683a_o.jpg
 
Last edited:
Mega Co-operation G4 Karachi

927347_1463783943859835_1807095930_n.jpg
10412938_273580999479813_926015435_n.jpg
 
1102265109-1.jpg


Gwadar

10169318_10154226627165442_6690568666643041721_n.jpg


G4, Karachi

Credit: @MWAhmed

923998_501560486612645_833837787_n.jpg


Tower II, Karachi

2_zps2dc56c1b.jpg


Azadi Chowk, Lahore

10356722_334254186729279_2679995032030367531_n.jpg

1528467_794244740621012_4088583540134339873_n.jpg

10389359_10152088983046712_3484223195812981995_n.jpg
 
Karachi BRT

35a0pz6.jpg

2rpe0z9.jpg

se2bte.jpg


Karachi Mass Transit Cell has engaged NESPAK for setting the Yellow Line in Karachi’s Bus Rapid Transit System (BRTS). Nespak will do the project’s feasibility. 4 kms of the 26 kms corridor will be elevated in congested areas. The project will cost (est) cost about Rs13 billion. About 148,000 persons will travel on the corridor daily. The figure will increase to 231,000 persons in 2030.

The project aims to cut traffic congestion in the city. Nespak has prepared the project’s preliminary design, engineering and environmental impact assessment.

The 26 km route stretches from Dawood Chowrangi in Landhi to Regal Chowk via Road 8,000 in Korangi Industrial Area, Korangi Road, Shahrah-e- Faisal (up to Nursery), Shahrah-e- Quaideen (up to Numaish), M A Jinnah Road and Preedy Street.

Yellow Line is one of the six BRT corridors included in JICA Transport Master Plan, ‘Yellow Line’ study will cover technical, financial, economic, legal and environmental aspects plus Transaction Advisory Services. The project will be convertible to Light Rail Transit (LRT), , when demand exceeds BRT capacity.

The project will give Karachi a high quality public transport system alleviating road congestion and substantially cut travel time with limited disturbance to the existing transport network.

Karachi to Get 4km Elevated Road

 
Last edited:
Karachi BRT

35a0pz6.jpg

2rpe0z9.jpg

se2bte.jpg


Karachi Mass Transit Cell has engaged NESPAK for setting the Yellow Line in Karachi’s Bus Rapid Transit System (BRTS). Nespak will do the project’s feasibility. 4 kms of the 26 kms corridor will be elevated in congested areas. The project will cost (est) cost about Rs13 billion. About 148,000 persons will travel on the corridor daily. The figure will increase to 231,000 persons in 2030.

The project aims to cut traffic congestion in the city. Nespak has prepared the project’s preliminary design, engineering and environmental impact assessment.

The 26 km route stretches from Dawood Chowrangi in Landhi to Regal Chowk via Road 8,000 in Korangi Industrial Area, Korangi Road, Shahrah-e- Faisal (up to Nursery), Shahrah-e- Quaideen (up to Numaish), M A Jinnah Road and Preedy Street.

Yellow Line is one of the six BRT corridors included in JICA Transport Master Plan, ‘Yellow Line’ study will cover technical, financial, economic, legal and environmental aspects plus Transaction Advisory Services. The project will be convertible to Light Rail Transit (LRT), , when demand exceeds BRT capacity.

The project will give Karachi a high quality public transport system alleviating road congestion and substantially cut travel time with limited disturbance to the existing transport network.

Karachi to Get 4km Elevated Road


Yellow by Sindh Gov Green with the help of Private partnership... and Blue will be build by Malik Riaz till Bahria to Tower... 3 Metro soon in Karachi+ Circular railway..... :yahoo::yahoo::yahoo::yahoo::yahoo:

Blue Line Metro Karachi by Malik Riaz....

url.jpg

route-map-Karachi-Metro-bus.jpg
 
Azadi Chowk, Lahore

Credit: Omi92 ssc

14441625983_716511f5dc_b.jpg

14418068701_4e658d86c0_b.jpg

14421404805_d0fd902161_b.jpg

14421388095_1b2704642a_b.jpg

14418011671_a16ee9c540_b.jpg


Islamabad-Rawalpindi Metro

Islamabad Side

1.jpg

6.jpg

DSC_1332.jpg


1102266022-1.jpg


Rawalpindi Side:

DSC_1251.jpg
 
River Ravi Bridge, Qutab Shahana, Sahiwal

10478169_895046887176467_3082240057797729034_n.jpg

1907367_895046797176476_8610501582879621651_n.jpg

10449937_895046993843123_4279226196334761844_n.jpg

10437439_895047003843122_7682370276883446136_n.jpg

1531650_895047360509753_5189422663023604881_n.jpg

10440929_895047397176416_6938214885001008205_n.jpg

10441266_895047937176362_5993906580941474966_n.jpg

8-3364-800-600-80.JPG
 
LAHORE | Signal Free Qainchi, Ghazi & Khaira Junctions

2pt6p2h.png
10325508_334999603321404_106829571188256339_n.jpg
10336702_334425250045506_5746427606148462208_n.jpg
10351462_334424946712203_4571957938344055492_n.jpg
14221169817_3e6436ecbc_b.jpg

Peshawar Mass Transit

BpPZt9WCcAEuXJ7.jpg
 
Some more pictures of Azaadi Chock

14234799688_738d58a91a_b.jpg
14234855938_589c9f0a7c_b.jpg
14234989007_9f37f6eea7_b.jpg
14398292946_06886757db_b.jpg
14418018471_8e5a823821_b.jpg
14421359895_8c785bd0fe_b.jpg
14441625983_716511f5dc_b.jpg


313.jpg
10389687_657589510991766_4886174663627245079_n.jpg
1102260357-1.gif
 
Last edited:
Back
Top Bottom