What's new

DRDO Surges Ahead With 2nd Phase of AEW&CS, Plans to Integrate AESA Radar o

shree835

BANNED
Joined
Jun 26, 2010
Messages
3,005
Reaction score
-19
Country
India
Location
India
The state-run Defence Research and Development Organization (DRDO) have received sanctions to pursue the second phase of AEW&CS (Airborne Early Warning and Control System) programme. In a recent report, DRDO Chief Dr.VK Saraswat has stated that the project will be called AEW&CS India and the requisite sanctions have been granted for the same. Besides, the homegrown AESA radar will also be integrated into the Tejas Mark II LCA.

According to DRDO Chief Dr.VK Saraswat, the AEW&CS project will be developed like the three Phalcon AEW&C systems acquired from Israel. Once the full clearance is acquired, DRDO will be selecting a platform based upon the radar configuration. DRDO indicated that the full clearance from the government is imminent since sanctions have been given.


Regarding the DRDO strategy, the indigenous Airborne Warning & Control System (AWACS) capabilities will be developed through a two pronged approach. The first phase will involve the mounting of the already developed radar system onto the Embraer aircraft from Brazil. The first of the three Embraer aircraft will be in India by this month end.

DRDO Chief Saraswat stated that the first phase is going smoothly the radar system will be integrated on the first Embraer aircraft this month. He added that dummy radar has already been integrated in Brazil on the platform and DRDO is satisfied with all parameters and integration activities of aircraft. Basically, the first phase of the AWACS will have surveillance capabilities in limited sectors with limited endurance capabilities.

Since two more Embraer aircraft will come to India next year, the indigenous radars are also getting ready for integration on them. DRDO has indicated that the AWACS project is its priority and that the three Embraer aircraft with the AWACS systems will be completely operational by 2014-15, according to DRDO.


Regarding the AEW&CS India project, DRDO indicated that it will be developing a complete 360 degree surveillance system. The technology which has been realized for the AWACS programme will be directly applicable in the second phase of the project. However, the configuration will be to ensure that there is 360 degree coverage. Unlike the phase one system with limited endurance, this will have larger power and reach in terms of the surveillance capability.


DRDO Chief VK Saraswat has also divulged into the details of the indigenously developed Active Electronically Scanned Array (AESA) radar in the AEW&CS project. Hailing the radar as the one the best in the world, DRDO chief said that it can capture images and send to the ground control centers besides incorporating all the features of an airborne surveillance system. It has unmatchable resolution, performance and electronic warfare capability.

The AESA radar is also expected to be integrated with the Tejas Mark II LCA besides other programmes. DRDO Chief added that the work is already on and the Tejas Mark-2 will have nothing but the AESA radar. The DRDO lab LRDE is working on the TR (Transmitter & Receiver) modules for the same. Apparently, it is now possible to configure small as well as large AESA radar. The advantage of AESA is that more power can be derived if you increase the numbers of TR modules. DRDO’s AESA radar will be of same size and volume of the present radar integrated on Tejas Mark-1. Once the work starts for the Mark-2 of Tejas aircraft, the old radar will be simply replaced by the indigenous AESA radar.

DRDO Surges Ahead With 2nd Phase of AEW&CS, Plans to Integrate AESA Radar on Tejas Mark 2 as Well
 
DRDO only has projects going on and on, apart from missile everything is very slow.
 
DRDO only has projects going on and on, apart from missile everything is very slow.


This is one project which i am sure is getting inducted. Atleast 3-5 will be in iaf soon. They have spent 300mill $ on the planes. They will have no answers if this fails.
 
DRDO only has projects going on and on, apart from missile everything is very slow.

please dont compare oranges with apples....

missile program was started half a century back & now we are getting the results. also inputs from ISRO must have helped DRDO in the development.

on the other hand Radar tech development started may be a decade back.

let the technology mature you will defenately see the results.
DRDO must not abandan any of its projects, these projects will creat tech base in the country & will be the foundation for the future development.
 
This is one project which i am sure is getting inducted. Atleast 3-5 will be in iaf soon. They have spent 300mill $ on the planes. They will have no answers if this fails.

As if they have answered before. Do not tempt them . :lol:
 
please dont compare oranges with apples....

missile program was started half a century back & now we are getting the results. also inputs from ISRO must have helped DRDO in the development.

on the other hand Radar tech development started may be a decade back.

let the technology mature you will defenately see the results.
DRDO must not abandan any of its projects, these projects will creat tech base in the country & will be the foundation for the future development.

yes ur right, slower faster or whatever just keep the work on. drdo is doing great in the field of radars. :tup:

it could be better if drdo is split in 5-6 different companies(electronics and radars, aerospace, armoured vehicles, aviation, avionics).

look at america they have rayethon, boeing etc etc.. with all different products. drdo is one company which has to do everyjob.
 
well the phalcon next order deal had turn out to be too expensive may be India deciding to build a 360 degree rotodome awacs on it's awacs on it's own.
 
DRDO was dedicated towards doing some good stuff on their own,obviously it would late.We don't need to make jokes on the DRDO time frame,because i have a faith on DRDO reliable products. The would be many reasons in time delay mainly lack of funds,eligible people and continues requirement changes on the final deliverable products...


 
Last edited by a moderator:

Back
Top Bottom