What's new

Bangladesh: Akhaura-Laksam Dual Gauge Double Line rail track inagurated.

Homo Sapiens

ELITE MEMBER
Joined
Feb 3, 2015
Messages
9,641
Reaction score
-1
Country
Bangladesh
Location
Bangladesh

Akhaura-Laksam Dual Gauge Double Line rail track inagurated​

Akhaura-Laksam Dual Gauge Double Line rail track inagurated

Akhaura-Laksam Dual Gauge Double Line rail track inagurated; File Photo

Prime Minister Sheikh Hasina today inaugurated the Dual Gauge Double Line on the Dhaka-Chattogram railway from Brahmanbaria’s Akhaura to Cumilla’s Laksam. With this, there are no single railway tracks on the Dhaka-Chittagong railway.


The Prime Minister inaugurated the double-line railway by joining virtually from Gonobhaban in the capital on Thursday (July 20).

With this, the entire section of the 321-km long Dhaka-Chattogram railway is being upgraded to a double line. No train will face crossings on this route, as a result, the journey time will be reduced.

Prime minister said that after the inauguration of the Dual Gauge Double Line on the Dhaka-Chattogram railway from Akhaura in Brahmanbaria to Laksam in Cumilla, the speed of trains on this line will be 120 kmph. We have brought the speed of rail on this line. Drivers need to be careful and think about how fast they are going.

Referring to this Dual Gauge Double Line, the Head of Government said, “With this, all Dhaka-Chattogram lines have been upgraded to double lines. Passengers can travel comfortably. The cost of transportation will also be reduced, the journey will take an hour less than before.”

“The work up to Cox’s Bazar is nearing completion,” the Premier also said.

Urging the countrymen to be careful so that the BNP-Jamaat does not damage the railway line, the Prime Minister said that it has been possible to do these things as the people of Bangladesh have voted for the Boat symbol. “It is a national resource, the people must protect it,” she also said.

The Premier said that BNP-Jamaat only knows how to destroy, they do not know how to create, and they do not know how to give anything. They only think about themselves, know how to loot, can do corruption, can do money laundering. May the countrymen be saved from them.

It is learned that there was a railway line earlier in the 72-km section from Akhaura to Laksam. Now it is upgraded into two lines.

The concern related to the project said that through this, the travel time of inter-city trains on the Dhaka-Chattogram route will be reduced from “a quarter of an hour to an hour”. Only meter gauge trains could run on this line at one time. However, since the two lines have been opened, broad gauge trains will also be able to ply there along with the meter gauge.

daily-bangladesh/AS

 
This is purely for connecting the BJP controlled state of Tripura to our ports and to Kolkata.

Why we need to give them sea shipping access - I have no idea. Probably transit for free.

Totally goes against our natural business interest.

India'r pa-chata BAL.
 
This is purely for connecting the BJP controlled state of Tripura to our ports and to Kolkata.

Why we need to give them sea shipping access - I have no idea. Probably transit for free.

Totally goes against our natural business interest.

India'r pa-chata BAL.
No, this is part of Dhaka-Chattogram railway. What you are meaning is 15 km long Akhaura-Agartala rail link project which will be opened in near future.
 
No, this is part of Dhaka-Chattogram railway. What you are meaning is 15 km long Akhaura-Agartala rail link project which will be opened in near future.

Thanks Bhai for correcting me.

I guess this will reduce DAC-CTG travel time by an hour (20%) ?
 
Last edited:

Akhaura-Laksam Dual Gauge Double Line rail track inagurated​

Akhaura-Laksam Dual Gauge Double Line rail track inagurated

Akhaura-Laksam Dual Gauge Double Line rail track inagurated; File Photo

Prime Minister Sheikh Hasina today inaugurated the Dual Gauge Double Line on the Dhaka-Chattogram railway from Brahmanbaria’s Akhaura to Cumilla’s Laksam. With this, there are no single railway tracks on the Dhaka-Chittagong railway.


The Prime Minister inaugurated the double-line railway by joining virtually from Gonobhaban in the capital on Thursday (July 20).

With this, the entire section of the 321-km long Dhaka-Chattogram railway is being upgraded to a double line. No train will face crossings on this route, as a result, the journey time will be reduced.

Prime minister said that after the inauguration of the Dual Gauge Double Line on the Dhaka-Chattogram railway from Akhaura in Brahmanbaria to Laksam in Cumilla, the speed of trains on this line will be 120 kmph. We have brought the speed of rail on this line. Drivers need to be careful and think about how fast they are going.

Referring to this Dual Gauge Double Line, the Head of Government said, “With this, all Dhaka-Chattogram lines have been upgraded to double lines. Passengers can travel comfortably. The cost of transportation will also be reduced, the journey will take an hour less than before.”

“The work up to Cox’s Bazar is nearing completion,” the Premier also said.

Urging the countrymen to be careful so that the BNP-Jamaat does not damage the railway line, the Prime Minister said that it has been possible to do these things as the people of Bangladesh have voted for the Boat symbol. “It is a national resource, the people must protect it,” she also said.

The Premier said that BNP-Jamaat only knows how to destroy, they do not know how to create, and they do not know how to give anything. They only think about themselves, know how to loot, can do corruption, can do money laundering. May the countrymen be saved from them.

It is learned that there was a railway line earlier in the 72-km section from Akhaura to Laksam. Now it is upgraded into two lines.

The concern related to the project said that through this, the travel time of inter-city trains on the Dhaka-Chattogram route will be reduced from “a quarter of an hour to an hour”. Only meter gauge trains could run on this line at one time. However, since the two lines have been opened, broad gauge trains will also be able to ply there along with the meter gauge.

daily-bangladesh/AS


Locos look cheap and ugly. Who made them?
 
Locos look cheap and ugly. Who made them?
I am sorry - if you call these cheap and ugly, you have no idea about what a modern loco should look like.

These are US origin/design (EMD) very modern meter-gauge locos made in Korea by Hyundai ROTEM. Imported in 2021. Not cheap by any means and far more reliable than anything imported from India. 2200 HP Diesel-Electric configuration.

These new locos use the EMD 8-710G3A-T2 as prime mover.

You have to see them up close. These are industrial machines, not supercars. Initially they were imported for pulling freight duty (container trains) - but for now they are subbing pulling passenger coach consists for BR. Passenger coaches will get more streamlined locos soon.

1689887662086.png


1689888174966.png


1689888569264.png


They are not going to win beauty contests but they are made of solid heavy gauge steel. That is what you need in Bangladesh, not GFRP/CFRP plastic in the front. Plus beauty is no guarantee of having speed.

In BR duty this series (design) of locos (one hundred in the series) are called "3000 class". 30 have been received so far from Korea.

Other than this - a series of new USA BG freight locos were also imported in 2022. These are made by EMD successor company Progress Rail and are USA Freight Loco design and standard. These are called 6600 series in BR duty and 40 were imported. They have 3200 HP engines and are capable of 140 KMPH speeds - but will probably operate at lower speeds. Image below.

1689888890859.png



All new 3000 and 6600 series locos are MU (multiple unit connectivity) capable.
 
Last edited:

Back
Top Bottom