To be ready in 500 days, Eastern Peripheral Expressway boasts of many firsts

HariPrasad

BANNED
Joined
Aug 5, 2013
Messages
14,055
Reaction score
-22
Country
India
Location
India
The Eastern Peripheral Expressway -- which is expected to provide major relief to Delhi from vehicular pollution -- is set to be completed in a record time of 500 days as against a sanctioned target of 910 days, NHAI officials said.

The 135-km Expressway will boast of many firsts including a closed tolling system in which toll will be collected only on the distance travelled and not on the entire length, National Highway Authority of India (NHAI) Chief General Engineer B.S. Singla told IANS.

There will also be provision for electronic collection of toll to ensure disruption-free movement of traffic.

"Apart from that, we have also installed weigh-in motion sensors on all entry points which will ensure that over-loaded vehicles are not allowed to enter the Expressway," he said.

Normally, weigh-in motion sensors are installed -- if at all they are -- at toll plazas when it is not possible to send the vehicles back. But here, the sensors are installed at all entry points with two gates -- one leading to the Expressway and the other redirecting the vehicle if it is over-loaded.

"We have also made provision for parking of overloaded trucks where they can unload some of the cargo to satisfy the weight criteria and then move to the Expressway. This is the first experiment of this kind," Singla said.

o check speeding, cameras have been put up every two kilometres.

"Over-speeding vehicles will be issued the challan at the toll plaza and the challan amount would be added to the total toll amount. This will be a great deterrent to over-speeding," Singla said.

While some work is still to be completed on the expressway which connects Palwal with Kundli bypassing Delhi, the Expressway is expected to be inaugurated by Prime Minister Narendra Modi on April 29.

All NHAI officers that the IANS spoke to expressed confidence in completing the pending work by then.

NHAI Member (Public Private Partnership) Neeraj Verma said the Expressway will reduce vehicular pollution in Delhi-NCR by around 27 to 28 per cent according to a study.

"Also, we have made it a green highway with solar panels installed at various locations which will provide power to illuminate the underpasses below the Expressway," he said.

Also, there are eight solar power plants along the Expressway having a capacity of 4,000 kilowatt. These plants will supply power to the grid and the amenities on the Expressway will take power from the same grid.

"So in effect we will produce the power that we consume and will have zero operating cost as far as power is concerned," Verma said.

He added that 33 per cent of the earth work on the highway was done using fly ash from coal power plants thereby compounding its contribution to reducing pollution.

Singla added that while Road Transport and Highway Minister Nitin Gadkari had ordered him and other officers to complete the work in 400 days as against the sanctioned target of 910 days, the team was able to finish the work in a record time of around 500 days despite several technical and other hurdles.

Gadkari's close aide Vaibhav Dange said this was achieved because of the personal interest Gadkari took in the project which also led to fast clearances.

"Every bill of the contractors was paid within 24 hours. Extra manpower was deployed and work was done day and night to complete this project in the record time," he said.

"And it is not just about completing this in lesser number of days. It's about the change in the attitude where now every stakeholder believes that it can be done," he added.

The 135-km six-lane access-controlled Expressway is built at a cost of around Rs 11,000 crore and will help decongest the national capital.

http://www.business-standard.com/ar...way-boasts-of-many-firsts-118042200267_1.html
 
The Highway radied in 500 days against target of 910 days.
 
How about Western peripheral expressway?
 
How about Western peripheral expressway?

It may also come in next few days i guess.
 
How about Western peripheral expressway?
No idea about western PE, but Northern + Southern (passing thru Ggn) are in last phases. Hayarana Govt has settled all land owners problems. PM is expected to open it by year end. Guess what, it is awesome in built quality.
 
The proof of the pudding lies in its tasting

Not intended to sound cynical but I shall believe things only when Delhi shows signs of decongestion.

It’s crazy to be stuck in a traffic jam at 4 am thanks to these trucks that pass through at night. Not to mention the traffic jam a break down left behind at night creates during the day.
 
Man this evil Modi will totally destroy India :cry:

what about muslim ? when will they be allowed to use roads ?
Oh! I forget to mentioned.. New fastag REFID tags actually deducts double toll if person is Muslim. Hell it actually make sure that speed of car surpasses max speed so more fine.. Bloody this Mudi is doing this to finance Road projects.. Shame on him
 
The proof of the pudding lies in its tasting

Not intended to sound cynical but I shall believe things only when Delhi shows signs of decongestion.

It’s crazy to be stuck in a traffic jam at 4 am thanks to these trucks that pass through at night. Not to mention the traffic jam a break down left behind at night creates during the day.
Hope for the best.. This is actually related to civic sense and let people follow traffic rules. During night at Gurgaon Expressway, due to trucks, I actually play game of car racing at speed of 100KMPH since bloody trucks runs parallel on all 4 lanes + 2 service lanes. Police is hand in gloves with them. :(

The proof of the pudding lies in its tasting

Not intended to sound cynical but I shall believe things only when Delhi shows signs of decongestion.

It’s crazy to be stuck in a traffic jam at 4 am thanks to these trucks that pass through at night. Not to mention the traffic jam a break down left behind at night creates during the day.

For impact on new road.. do visit Cyber city and 16 lane highway crossing Gurgaon. Fcuk, never before crossed cyber city in 15 min flat and reached Faridabad road in office hours.
 
2.5 lakh trees shall be planted on the sides of this highway. There shall be a water collection body at every 500 m. Water so collected shall be used to water trees with electrcity generated by solar cells. 21 gardens shall be developed on the side of highways.

4 MW solar power shall be generated by putting solar pannels around highway. This electriccity shall be used to power all utilities of the highway.
 
I knew it ....... down with evil Modi. :angry:

I demand this highway be named after Khilji or AUrangzeb to show secularism.

You missed babur and gauri...

2.5 lakh trees shall be planted on the sides of this highway. There shall be a water collection body at every 500 m. Water so collected shall be used to water trees with electrcity generated by solar cells. 21 gardens shall be developed on the side of highways.

In Sikandranad, UP... on western peripheral the toll plaza would fulfil its need from solar power plant... plus huge water body is there... and plantation of saplings is already in full swing...

Travel on Manesar-Palwal highway is flawless... and believe me it is real fun as cops are lenient on over speeding...
 
You missed babur and gauri...



In Sikandranad, UP... on western peripheral the toll plaza would fulfil its need from solar power plant... plus huge water body is there... and plantation of saplings is already in full swing...

Travel on Manesar-Palwal highway is flawless... and believe me it is real fun as cops are lenient on over speeding...

I believe 120 kmph speed ceiling is too low. Today I draw my car at 160 kmph on a narrow road stretching just 3 km.
 
I believe 120 kmph speed ceiling is too low. Today I draw my car at 160 kmph on a narrow road stretching just 3 km.

And I thought that 150 in my Innova was fast... hehehe... but yes it was on almost entire stretch...
 
The 135-km Expressway will boast of many firsts including a closed tolling system in which toll will be collected only on the distance travelled and not on the entire length, National Highway Authority of India (NHAI) Chief General Engineer B.S. Singla told IANS.
Rest is good but how is this a new feature? This is the case with many express ways. For example NICE road in Bangalore
 
Rest is good but how is this a new feature? This is the case with many express ways. For example NICE road in Bangalore

NICE road is one single stretch with few variable pricing. And its not under NHAI. Its under state govt.
 
Back
Top Bottom