No I am not there in PSK blog. I went to read there bcz 2 way link question has been harped a lot in BR forum and also how the mod there believes Su35 is a better option than Rafale even though it was never in MMRCA. I was hoping PSK would shed some more light and leak the offset and technologies bcz i believe it has reached his ears.
Its just that Vstol has asked me not to reveal the details under technology and offsets and let it leak or revealed naturally. So i am waiting for natural course.
Well the best plane that come close to rafale for its role from russia is Su-34 and not Su-35. The first comment of the PSK about the two requirement, one DPSA and another cheap MRCA was good.
I asked PSK about the future of the Kaveri, and his answer was that Kaveri is just the tech. demonstrator, and latter higher rated engine on the basis of the Kaveri will be mass produced.
If you are saying about FOC its already postponed. The project status with the progress is not very good atm. The planes are being built a bit too slow. The way it looks even meeting the first 20 order will be a very big challenge
2000 posts and you can become senior member. Use the indian political and economical threads and post or else use the currecnt topics post and you will get there in max 2-3 days or else a week or 10 days max
Yes the engine uprating is on the cards.. But i am more worried about LCA as i am having a strong feeling a sperate LWF is coming.
See below my discussion with Skull and Bones..
Essentially HAL itself is killing tejas
Well I was not asking about FOC specifically. FOC delay was expected, because there are still many grey areas in the LCA project. Problem is that the integration should have been given to much experienced HAL and not ADA which should only be the R&D entity.