SATPARA Dam – Lot C & HS



  • Client & Owner:
Water and Power Development Authority (WAPDA)
Description of Works: Embankment of existing lake (8,000 ft above the sea level) to create a reservoir for irrigation, water supply and power generation. Construction of Civil Works & Hydraulic Steel Works for the Dam & Powerhouse comprising, Dam, Spillway, Coffer Dam, Outlet & Intake Structures, Box & Circular Conduits, Control Tower & Stilling Basin, Two Power Houses, Headrace, Fore Bay, Spill Channel, Penstocks, Gates, Trash Racks and Stop Logs.
  • 1. MAIN COMPONENTS
  • a) Dam (Type: Earth Fill): Height : 128 Ft.
  • Length : 650 Ft.
  • Top Width : 30 Ft.
  • b) Spillway: Length : 1,075 Ft.
  • Width : 50 Ft.
  • c) Command Area: Left Bank Canal : 8,119 Acres
  • Right Bank Canal : 2,012 Acres
  • CCA : 10,131 Acres
  • d) Length: Left Bank Canal : 59,000 Ft.
  • Right Bank Canal : 30,000 Ft.
  • Man-hours: 2.4 million
  • Peak manpower : 450
  • Completion : September 2006