Sharif refuses to take blame for Pak power crisis
June 4, 2018, 4:50 PM IST

Nawaz_Sharif.jpg


Islamabad: Former Pakistan prime minister Nawaz Sharif on Monday refused to take the blame for the power crisis in the country.

According to The News, the energy shortage in Pakistan has adversely impacted the economy. The country is currently facing up to 18 hours of power outages a day and is expected to face a more acute electricity crisis, if the matter is not dealt with a sense of urgency.

A special parliamentary committee on circular debt was told last month that the transmission and distribution system needs USD 40-50 billion in investment to put an end to load shedding across the country. These numbers severely question the PML-N government’s approach to the power sector.

Geo News, however, quoted Sharif, as saying “When we left (office in July 2017), everything in the country was fine.”

Sharif was addressing media outside an accountability court.

He was appearing before an accountability court in Islamabad, which adjourned the cross-examination of the Panama Gate Joint Investigation Team (JIT) head and prosecution’s star witness, Wajid Zia, in the Al-Azizia reference against the Sharif family till June 11.

Accountability court’s Judge Muhammad Bashir while adjourning the cross-examination directed the prosecution to submit final arguments in London flats case by tomorrow.

Sharif said that the PML (N) government that had just completed its tenure on May 31 had inaugurated many projects for the benefit of the people of the country.

“Before the end of (their) tenures, former prime minister Shahid Khaqan Abbasi and Punjab Chief Minister Shahbaz Sharif had inaugurated many projects, including 39 mega projects and motorways.”

On upcoming projects, he said he hoped to inaugurate motorways in Lahore, Multan, and Sukkur.


Taking a direct dig at arch-rival Imran Khan’s Pakistan Tehreek-e Insaf party, Sharif said, “The performance of all others parties is next to none.

Please Imran Khan, tell us which project have you completed. If there is any project on social sector and electricity then please tell us.”

Pakistan will hold elections on July 25.

(ANI)

https://www.siasat.com/news/sharif-refuses-take-blame-pak-power-crisis-1364673/

Ok so he is asked about power crisis and he shows off motorway? Kind of proves the point, right? He was to busy with the motorways to give a crap about power and THUS, IS to be blamed for his shear ignorance!

And he even takes a dig at IK for fun? IK wasnt PM? NOT EVEN CM! and he wants to compare his PM position to one who wasnt? Shows how clueless he is as to what being PM means! Either that or he learnt that he can run his mouth dry coz he has been untouchable?

I am not sure if he is stupid, thinks the people are stupid (sure majority are) or he just needs to be slapped till he goes fully bald?!


 
. . . . .
you think he is right then Good luck.
ohh bhai we need 40-50 bn$ for upgrade our transmission lines he is right

its more like 40-50 billion rupees
its $ sir pakistani transmission system is colonial era only islamabad has modern transmission lines and underground lines with modern transformers . rest of the country is lala land . to bring it first world its need billions of $

we already spend hundreds of millions $ but no change on ground
 
.
ohh bhai we need 40-50 bn$ for upgrade our transmission lines he is right


its $ sir pakistani transmission system is colonial era only islamabad has modern transmission lines and underground lines with modern transformers . rest of the country is lala land . to bring it first world its need billions of $

we already spend hundreds of millions $ but no change on ground
Did he mean by underground transmission line all over the country ? Are you sure ?
@Azadkashmir
@AZADPAKISTAN2009
 
.
Did he mean by underground tranmission line all over the country ? Are you sure ?
yeah he was qouting few days ago news which some international body said 35 to 45bn$ needed to upgrade pakistan power sector .

bhai jaan 1 lakh ka single wire 70mm ka roll ata hai ap ne kabhi wire nhi khareedi kya ?:lol: look like overseas Pakistanis have no idea of cable prices in Pakistan . transformer ke liye to hum log vote bhi de dety hain sarkaar :D what is the price of 200KVA transformer sir ?
 
.
Don't worry guys , Nawaz even refused to take the responsibility for the birth of his children .
 
.
Don't worry guys , Nawaz even refused to take the responsibility for the birth of his children .
he is very upset because of beghairat sons leave him alone :lol: but bublu said alhamdullilah apartment bhi hamary hain -factories bhi hamari hain or offshore to is nacheez ki hain :lol:
 
. .
We should commission out all the IPPs once for all and divert those circular debt funds towards builing dams and nuclear power plants. This elitist class opposed any new power project for the sake of their some 10000 MW which they are producing at their private power houses.
 
.
Well, I know where the electricity is...it in his and his daughters rears..WAPDA just need to plug the main grid in their asses and everything will be fine. We can design a dock for them.
 
.
yeah he was qouting few days ago news which some international body said 35 to 45bn$ needed to upgrade pakistan power sector .

bhai jaan 1 lakh ka single wire 70mm ka roll ata hai ap ne kabhi wire nhi khareedi kya ?:lol: look like overseas Pakistanis have no idea of cable prices in Pakistan . transformer ke liye to hum log vote bhi de dety hain sarkaar :D what is the price of 200KVA transformer sir ?
yup i have no idea about the cost.. But i am interested to know how much cost(USD) it will take for one mile overhead transmission line, the cost will depand on 500, 220, 132 kva etc along with grid stations.
 
.
yup i have no idea about the cost.. But i am interested to know how much cost(USD) it will take for one mile overhead transmission lines, also the cost will depands on 500, 220, 132 kva etc.
sir ji system is very old and its need to upgrade . i have no idea but its ages studies are saying we have to upgrade distribution and transmission system otherwise even if we generate 50k MW we can not use it .
 
.