What's new

Rail link to Kashmir Valley to be launched tomorrow

Feeling sad ...... :D

cutting-onion.jpg

Onions only sends others crying .


Prove me wrong what i said in earlier post.
 
. . . . . .
BANIHAL, J&K: Prime Minister Manmohan Singh along with UPA chairperson Sonia Gandhi on Wednesday flagged off the first train connecting Banihal in Jammu region with Qazigund in Kashmir Valley.

The newly constructed station here, 125 km from summer capital Srinagar, was decked up with flowers and garlands to receive the VVIPs for flagging off the first train which will pass through 11 km tunnel through Pir Panchal range.

The eight-coach train carrying school children and officials of IRCON and Railways reached Qazigund in 25 minutes.

The Banihal-Qazigund section, which includes an 11-km long tunnel, the country's longest, reduces the 35 km distance to 18 km. It has been constructed at a cost of Rs 1,691 crore.

The Prime Minister and Sonia Gandhi boarded the train before its departure and interacted with the school children. They returned to Banihal from the new tunnel. The Udhampur-Banihal section is expected to be completed by 2017 connecting the Valley to the rest of the country round-the-year without any hindrance.

The train will make regular operation from Banihal to Baramulla in north Kashmir from June 27. The Banihal-Baramulla -Banihal train will make five trips daily beginning at 7.10am from Banihal and 7.35am from Baramulla.

Besides the Prime Minister and Sonia Gandhi, others present on the occasion were Governor N N Vohra, chief minister Omar Abdullah, railway minister Mallikarjun Kharge and health minister Ghulam Nabi Azad.

Train service is already operational within Kashmir Valley on the 118-km-long route between Qazigund and Baramulla in north Kashmir. This was inaugurated by Prime Minister Manmohan Singh on October 11, 2008.

The tunnel has been constructed using New Austrian Tunnelling Method, which has been used for the first time on such a large scale in India. This method optimises the tunnel design by mobilising the inherent ground strength in adopting a curved section, providing primary support system immediately after excavation and monitoring the ground behaviour while permitting it to develop its inherent strength.

A three-metre wide road has been provided inside the tunnel for maintenance and emergency rescue and relief operations. The tunnel has been made water-proof by providing continuous PVC membrane between primary and secondary lining.

PM, Sonia flag off train connecting Banihal in Jammu and Qazigund in Kashmir - The Times of India


kashmir_full.jpg
 
. .
Some pics


Bani2.jpg

Burkhas should be banned in India. They are oppressive and against our culture. We wear saris where the midrift shows or dresses with exposed backs, cleavage and most definitely exposed head.
 
.
Back
Top Bottom