GSLV-D5 at the Second Launch Pad (Umbilical Tower)
GSLV-D5 moving towards Launch Pad
GSLV-D5 being moved from Vehicle Assembly Building to Launch Pad
Fully integrated GSLV-D5 in the Vehicle Assembly Building
Indigenous Cryogenic Upper Stage is being integrated with GSLV-D5 Second Stage
Indigenous Cryogenic Upper Stage being lifted from its transporter at the Vehicle
Assembly Building
Hoisting of GSLV-D5 Second Stage during Vehicle Assembly
GSLV-D5 Core Stage with four Strap-Ons at the Vehicle Assembly Building
One of the Strap-on Motors of GSLV-D5 being integrated with the GSLV-D5 Core Stage
Two Segments of the GSLV-D5 First Stage are being joined together at the Vehicle Assembly Building