What's new

Nuclear Power Plants

..
Mr. Stone presents the Pinstech (Pakistan Institute of Nuclear Science &Technology) model to President Ayub Khan, November 1961



13419043_1067098963370556_1465545362212016975_n.jpg








Pinstech Nuclear Reactor Islamabad 1965.


13087103_1042053972541722_5489184978962292651_o.jpg
 
Some facts about Nuclear Power in Pakistan.

Operating Plants: 4

C-1 operating at 325 MW
C-2 operating at 330 MW
C-3 operating at 255 MW (still in testing phase, rated at 340 MW, Formal inaguration in december)
KANUPP operating at 80 MW (Rated at 137 MW, low power operation)

Units under-construction:

C-4 340 MW (Planned Grid connection in 2017 Nov)
K-2 1100 MW (Planned Grid connection Aug 2021)
K-3 1100 MW (Planned connection Aug 2022)

Units Planned:

C-5 1100 MW (under study, Inauguration expected in 2018 before elections)
M-1 1100 MW just planned
M-2 1100 MW just planned


Update on K-2
Work on trubine building started: 10% complete
Inner containment completed 75%
Work on intake & outfall started.
Work is slow. working only 8-9 hours per day.
 
Prime Minister (PM) Nawaz Sharif will inaugurate power production from Chashma Nuclear Project-III on Wednesday.

According to a press release issued on Tuesday, the 340 megawatt (MW) Nuclear Power Plant is a joint collaboration of Pakistan Atomic Energy Commission (PAEC) and China National Nuclear Corporation (CNNC).

This is the third project after the successful Chashma-I and Chashma-II projects.

Chashma-IV Nuclear Power Project is to be completed in 2017. The Karachi Nuclear Power Projects K-2 and K-3 would add 8,800MW electricity to the National Grid by 2030 as Mid-Term target for Pakistan Atomic Energy Commission.

All Nuclear Power Projects, including Chashma-III, have been approved by Pakistan Nuclear Regulatory Authority for Nuclear Safeguards as per International Atomic Energy Agency (IAEA) agreements, thereby maintaining the highest standards of safety.

The Chashma-III project would be yet another milestone in the Pak-China joint collaborations. The project will provide clean and affordable energy to the people of Pakistan, in line with the present government’s vision to control energy crisis.

The project would also contribute to the overall economic development of the country through energy supply to industrial and commercial sectors.
 
Pakistan’s fourth nuclear power plant, built with China's assistance, goes online

5863c6f273f33.jpg


The Chashma-III reactor is pictured in Chashma, some 250 kilometres southwest of capital Islamabad. —


5863c6e91abe4.jpg



Prime Minister Nawaz Sharif on Wednesday inaugurated power production from 340 megawatt Chashma-III nuclear power plant 'C-III' near Mianwali,


5863c6ae921f9.jpg



Speaking at the inauguration ceremony, the prime minister slammed the opposition, calling on them to refrain from 'sabotaging' Pakistan's national interests.

"We shouldn't waste our time launching unnecessary protests," he said.

"Ending loadshedding is one of our top priorities," he said, reiterating his government's commitment to end loadshedding by 2018.

The power project is a joint collaboration between the Pakistan Atomic Energy Commission (PAEC) and China National Nuclear Corporation. It was executed by the PAEC under the guidelines of the International Atomic Energy Agency.

PM Nawaz said the Chashma-III nuclear power plant will add 600MW to the national grid, adding that it will also help PAEC in achieving the overall target of 8,000MW. He also directed the PAEC to accelerate the production of nuclear power plants.

5863c6ae45caa.jpg


Officials walk before the inaugural ceremony of The Chashma-III reactor.

The premier congratulated the participants and the Atomic Energy Commission (PAEC) on timely completion of the project and thanked the China Atomic Energy Authority and the Export-Import Bank of China for extending technical and financial support to the endeavour.

The Chashma-III nuclear power plant was preceded by the Chashma-I and Chashma-II power projects.

Another unit of the same capacity, Chashma-IV, is expected to be completed in the coming year. The premier expressed hope that the Chashma-IV would be completed before its deadline.

Additionally, the Karachi nuclear power projects K-II and K-III are expected to add a total of 8,800MW electricity to the national grid by 2030 as a mid-term target for the PAEC.

The prime minister said that timely completion of the K-II and K-III nuclear power plants will strengthen bilateral relations with China. He invited Chinese investors to invest in various sectors in projects that are mutually beneficial.
 
First fuel loading of C-4 to start on 10th of feb. C-4 cleared crew performance evaluation that was conducted by WANO, a prerequisite for the start of any nuclear plant.
 
Operating Reactors in Pakistan

Reactor Province Type MWe net Construction start Commercial operation Planned close

Karachi 1
Sindh PHWR 125 1966 December 1972 2019
Chashma 1 Punjab PWR 300 1993 June 2000 2040
Chashma 2 Punjab PWR 300 2005 May 2011 2051
Chashma 3 Punjab PWE 315 May 2011 December 2016 2056
Total (4) 1040 operating

Karachi is also known as KANUPP, Chashma as CHASNUPP.
Enriched fuel for the PWRs is imported from China.

The 2005 Energy Security Plan included intention of lifting nuclear capacity to 8800 MWe, 900 MWe of this by 2015 and a further 1500 MWe by 2020. Projections included four further Chinese reactors of 300 MWe each and seven of 1000 MWe, all PWR. There were tentative plans for China to build two 1000 MWe PWR units at Karachi as KANUPP 2&3, but China then in 2007 deferred development of its CNP-1000 type which would have been the only one of that size able to be exported. Pakistan then turned its attention to building smaller units with higher local content. However, in 2013 China revived its 1000 MWe designs with export intent, and made overtures to Pakistan for the ACP1000 design, which became Hualong One – see below.

Chashma 3 and 4

In June 2008 the government announced plans to build units 3&4 at Chashma, each 320 MWe gross and largely financed by China. A further agreement for China's help with the project was signed in October 2008, and given prominence as a counter to the US-India agreement shortly preceding it.

In March 2009 China's SNERDI announced that it was proceeding with design of Chashma 3&4, with China Zhongyuan Engineering Corp (CZEC) as the general contractor and China Nuclear Industry No.5 Construction Company as installer. In April 2009, a design contract with SNERDI was signed, and the government said that it had approved the project at a cost of $2.37 billion, with $1.75 billion of this involving "a foreign exchange component". In March 2010 Pakistan announced that it had agreed the terms for Chashma 3&4, whereby China would provide 82% of the total US$ 1.912 billion financing as three 20-year low-interest loans. It would also provide fuel for the reactors’ lifetime nominally of 40 years.

The main construction contract was signed in June 2010, and the two 340 MWe CNP-300 (315 MWe net) units were to be completed in eight years. They will have a design life of 40 years and be under IAEA safeguards. Construction of unit 3 officially started at the end of May 2011, and unit 4 in December 2011. Early in 2014 PAEC said they were several months ahead of schedule. In 2015 CZEC said completion of unit 3 would be in 2016, and in fact it was grid-connected in October, with full power and commercial operation in December. Unit 4 is expected to be grid connected by mid-2017.

The Nuclear Suppliers Group (NSG) has raised some questions about China's supply of Chasma 3&4. Contracts for units 1&2 were signed in 1990 and 2000 respectively, before 2004 when China joined the NSG, which maintains an embargo on sales of nuclear equipment to Pakistan. China argued that units 3&4 are similarly "grandfathered", and arrangements are consistent with those for units 1&2.

Chashma 5

In November 2010 the PAEC is reported to have signed a construction agreement with China National Nuclear Corporation (CNNC) for a fifth unit at Chashma. In February 2013 a further agreement was signed by PAEC with CNNC for a 1000 MWe unit at Chashma. It was reported that China expected that this deal would be controversial under the NPT and guidelines of the NSG. Early in 2013 CNNC confirmed its intention to build a 1000 MWe class reactor, and said it would be an ACP1000 unit, though not necessarily at Chashma. The status of any continuing plan for Chashma 5 is very uncertain, and it may have been displaced by plans for a plant near Multan in southwest Punjab. Certainly it has been overtaken by the Karachi Coastal project.

Karachi Coastal power project, K2 and K3

In June 2013 the Planning Commission said that two CNNC 1000 MWe class reactors would be used for Karachi 2 and 3 (KANUPP 2&3) near Karachi unit 1. Two coastal sites had been under consideration for the twin 1100 MWe units. CNNC in April 2013 announced an export agreement for the ACP1000, nominally 1100 MWe, apparently for Pakistan. This was confirmed in June by the PAEC which said that the next nuclear project would be 1100 MWe class units which it would build, the Karachi Coastal Power station.

In July 2013 ECNEC approved two units of the Karachi Costal Power Project with net generation capacity of 2,117 MWe. The total cost of this was estimated at Rs 959 billion ($9.595 billion), with $6.5 billion (68%) being vendor finance. PAEC also said that 82% of the total cost would be financed by China. At the end of August 2013 contracts were signed in Shanghai with CNNC, China Zhongyuan Engineering Co. Ltd. (CZEC), China Nuclear Power Engineering Co. Ltd. (CNPE), Nuclear Power Institute of China (NPIC), and East China Electric Power Designing Institute (ECEPDI). Ground breaking at the site near Paradise Point, 25 km west of Karachi, took place in November 2013, but in October 2014 the Sindh high court ruling stopped site work following a challenge on environmental grounds, and the restraining order was extended to early December. The project was re-launched in August 2015, and construction of the first unit started then.

The Pakistan Nuclear Regulatory Authority received the safety analysis of China’s ACP1000 reactor from CNNC and after completing the review granted a construction licence, for the CNNC version of Hualong One, 1161 MWe gross.

In April 2015 China Nuclear Engineering & Construction Group Co (CNEC) won the tender for civil engineering construction and installation work for the conventional island of the plant, which it said would use Hualong One reactors. The associated China Zhongyuan Engineering Corporation (CZEC) became the general contractor. Construction of the first unit started in August 2015 with little fanfare and is expected to take 72 months (52 months for conventional island). Construction of the second unit started at the end of May 2016, according to IAEA, but without any announcement or notification on the PAEC website.

In the light of its inability to buy uranium on the open market, PAEC says that Pakistan has agreed with CNNC to provide lifetime fuel supply for the reactors, this being specified as 60 years.

Nuclear Power Reactors Under Construction

Reactor Province Type MWe gross Construction start Planned commercial operation

Chashma 4
Punjab CNP-300 340 Dec 2011 October 2017
Karachi 2 (Coastal) Sindh Hualong One 1161 Aug 2015 late 2021
Karachi 3 (Coastal) Sindh Hualong One 1161 May 2016 late 2022
Total (3) 2662

Karachi Coastal is also known as K2 & K3, or KANUPP 2&3
 
K-2, K-3 nuclear reactors to be safeguard by IAEA


The International Atomic Energy Agency (IAEA) on Wednesday approved Pakistan's request for application of safeguards at nuclear power plant units K-2 and K-3, said a statement released by the Ministry of Foreign Affairs.

The approval from the international watchdog was given by its board of directors, added the statement.

K-2 and K-3 are pressurised water reactors with a installed capacity of 1,100MWs each and are being acquired from the People's Republic of China.

The groundbreaking of K-2 and K-3 power plants was performed by Prime Minister Nawaz Sharif in November 2013.

The project had been in the media spotlight for quite some time with representatives of civil society organisations raising a number of reservations over it, with the chief concern being the close proximity of the project to the city.

China is the only country physically helping Pakistan in building the reactors while international organisations are helping the country follow safety guidelines.

The K-2 and K-3 reactor is being built by China National Nuclear Corporation (CNNC) and other organisations. It would be built by using Hualong One, the CNNC’s third-generation nuclear reactor design.

The World Nuclear Association had earlier estimated the cost of the new project at nearly $10 billion.
 
First fuel loading of C-4 started on 10th of feb. C-4 cleared crew performance evaluation that was conducted by WANO, a prerequisite for the start of any nuclear plant.

C-4 has achieved first criticality. Grid Synchronization planned before 30th April.


15442184_1030028190458212_2785217941380335615_n.jpg




A view of all four unit of Chasma Nuclear Power Plants C1,C2,C3,C4.
 
340 MW Chashma-4 nuclear power plant would be started generation to the national grid by May 2017
A view of all four unit of Chashma Nuclear Power Plants ,


Chashma Nuclear power plants

Chashma 1.......... 325 MW operational.. 2000
Chashma 2........... 325 MW operational ..2011
Chashma 3.......... 340 MW operational.. 2016
Chashma 4...........340 MW.. May 2017
 
Chinese firm wins bid to supply steel for Karachi nuclear power plant:

https://www.dawn.com/news/1327573/ch...-media-reports

Chinese steel manufacturer Baosteel has won a bid to supply steel to the ongoing nuclear coastal power plants (K-2 K-3) in Karachi, in what is being reported to be the "first export deal for China-designed, third-generation nuclear power technology", Chinese media reported on Monday.

With the state-owned Baosteel supplying Pakistan with relevant resources for Karachi’s two upcoming nuclear power stations, Global Times reported that China is now the fourth nation in the world after the United States, France and South Korea to independently export third-generation nuclear power technology.

Prime Minister Nawaz Sharif inaugurated the coastal power projects at the Karachi Nuclear Power Plant (Kanupp) in 2015. The power plant is said to be the largest in the country and will generate 1,100MW electricity upon completion.

"The construction of K-2 and K-3 power plants will further strengthen the steadfast friendship between the two nations," Nawaz had said.

The World Nuclear Association had earlier estimated the cost of the new project at nearly $10 billion.

Under the Chinese government's plan for nuclear power, Baosteel has been developing steel for nuclear power plants since 2006.
 

Back
Top Bottom