Karachi Metro Bus

Japanese envoy enjoys a ride in Karachi’s Green Line bus

Japanese official travelled with ordinary passengers from Numaish to Golimar neighbourhood of the metropolis


News Desk
December 28, 2021



 
A new and unknown world of mass transit opened up for Karachiites as the Green Line bus service became fully operational on Monday. As many as 80 buses could be spotted moving towards Surjani Town from Numaish and the other way around from 7am till 10pm.

For now one can get tickets in two ways one of which is going to the ticketing booth and pay Rs55 for a ticket for whether you are travelling to the station ahead or to all 22 stations. But another better and economical way is to buy a Rs100 card which can be topped up. As you reach a station to get off, the machines there will deduct your fare as per kilometer of your traveling.



1641910797413.png
 
#Karachi has a glorious bus-based mass transit line, 23 years after the Karachi Circular Railway shut down, and I couldn’t be happier. This is the Board Office station. A bunch of city enthusiasts went up & down the entire line to celebrate!

We got on at the cavernous Numaish station. The sight of a ticket booth was pure joy. I could hardly contain my joy!

That fresh bus smell and shine 🤩✨

 
The pictures of the transit system looks beautiful.

What is the occupancy rate? Is the operation subsidized by the gov.?

Does Karachi have plans for metro project? A city of its size will eventually need metro trains!
 
The pictures of the transit system looks beautiful.

What is the occupancy rate? Is the operation subsidized by the gov.?

Does Karachi have plans for metro project? A city of its size will eventually need metro trains!

Yes.

Karachi Metro Bus

Transit type.................
Bus rapid transit (BRT)

System length.............. 109 km (67.7 mi)

The Karachi Metro bus is an under-construction 109 km (67.7 mi)

The expected daily ridership would be 350,000 and the system length would be 109 km. Upon completion it is expected to be the largest metro bus service in the country. Karachi Metrobus was inaugurated on Feb 25, 2016 and is expected to begin operation by Feb 2017.

The system is divided into several line's, the construction on the Green Line started on February 26, 2016, the line has 22 bus stations covering an length of 26 km. Orange Line construction begin on June 11, 2016 and is the smallest of the five line's spreading over 3.9 km with only four stations. The Blue Lane is funded by BT is undergoing preliminary design.


Route

The initial "Green Line" is one of several proposed Karachi Metrobus lines that will crisscross Karachi and complement the Karachi Circular Railway. The route will approximately 26 km (16 mi). When completed, it will have the capacity to carry 150,000 people daily.

Lines,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Green Line


The Green Line will extend from Surjani Town to Merewether Tower at a total length of 26 km (16 mi). The Federal government will be financing the majority of the project.

The Main Design & supervision Consultant for Green Line is Engineering Associates Pvt Ltd. & for Traffic Engineering Think Transportation is associated with this project. The government is in process of acquiring a 18-metre-long 24 buses.

Green Line
  • Numiash Chowrangi Terminal (To Blue Line/Yellow Line)
  • Mazar-e-Quaid Station
  • Guru Mandir Chowrangi Station
  • Lasbela Chowk Station
  • Gulbahar Station
  • Nazimabad Chowrangi Station
  • Eid Gah Ground Station
  • North Nazimabad Station (to KCR)
  • AO Tower Station
  • KDA Chowrangi Station
  • Sharah-e-Jehanghir Station
  • Sakhi Hassan Circle Station
  • Nagan Chowrangi Station
  • U.P. More Station
  • Power House Roundabout Station
  • 4K Chowrangi Station
Blue Line

The Blue Line will extend from Merewether Tower to Bahria Town through DHA City, Karachi (DCK) in the way at a total length of 30 km (19 mi), and will be the first privately funded transport system in Pakistan being funded by the Bahria Town.The line's construction is likely to start in the first quarter of 2017.

Blue Line
  • Merewether Tower Terminal
  • Numiash Chowrangi Terminal (to Green Line/Yellow Line)
  • Liaquatabad Station (to KCR)
  • Bahria Town Terminal
Yellow Line

The Yellow Line will extend from Numiash Chowrangi to Landi Station at a total length of 26 km (16 mi). The Sindh government and Karachi city government will be financing the majority of the project.[17]

Yellow Line
  • Numiash Chowrangi Terminal (to Blue Line/Green Line)
  • Landi Station Terminal (to KCR)
Red Line

The Red Line will extend from Model Colony to Regal Chowk Via Safoora Goth and University Road at a total length of 27 km (17 mi). Asian development bank will be financing the project.[17]

Red Line
  • Regal Chowk Terminal (to Blue Line/Yellow Line)
  • Regal Chowk Station Terminal (to KCR)
Orange Line
Orange Line Package-I

Orangi line would be spread over 3.75 kilometres of which one kilometer is an elevated lane. The construction started in summer of 2016 and is likely to completed by mid-2017. The line will have the capacity to carry upto 50,000 passengers daily and there would be a station after every kilometer. The line commence's from Shaharh-e-Quaideen and merge's with the Green Line at the board office
 
Yes.

Karachi Metro Bus

Transit type.................
Bus rapid transit (BRT)

System length.............. 109 km (67.7 mi)

The Karachi Metro bus is an under-construction 109 km (67.7 mi)

The expected daily ridership would be 350,000 and the system length would be 109 km. Upon completion it is expected to be the largest metro bus service in the country. Karachi Metrobus was inaugurated on Feb 25, 2016 and is expected to begin operation by Feb 2017.

The system is divided into several line's, the construction on the Green Line started on February 26, 2016, the line has 22 bus stations covering an length of 26 km. Orange Line construction begin on June 11, 2016 and is the smallest of the five line's spreading over 3.9 km with only four stations. The Blue Lane is funded by BT is undergoing preliminary design.


Route

The initial "Green Line" is one of several proposed Karachi Metrobus lines that will crisscross Karachi and complement the Karachi Circular Railway. The route will approximately 26 km (16 mi). When completed, it will have the capacity to carry 150,000 people daily.

Lines,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Green Line


The Green Line will extend from Surjani Town to Merewether Tower at a total length of 26 km (16 mi). The Federal government will be financing the majority of the project.

The Main Design & supervision Consultant for Green Line is Engineering Associates Pvt Ltd. & for Traffic Engineering Think Transportation is associated with this project. The government is in process of acquiring a 18-metre-long 24 buses.

Green Line
  • Numiash Chowrangi Terminal (To Blue Line/Yellow Line)
  • Mazar-e-Quaid Station
  • Guru Mandir Chowrangi Station
  • Lasbela Chowk Station
  • Gulbahar Station
  • Nazimabad Chowrangi Station
  • Eid Gah Ground Station
  • North Nazimabad Station (to KCR)
  • AO Tower Station
  • KDA Chowrangi Station
  • Sharah-e-Jehanghir Station
  • Sakhi Hassan Circle Station
  • Nagan Chowrangi Station
  • U.P. More Station
  • Power House Roundabout Station
  • 4K Chowrangi Station
Blue Line

The Blue Line will extend from Merewether Tower to Bahria Town through DHA City, Karachi (DCK) in the way at a total length of 30 km (19 mi), and will be the first privately funded transport system in Pakistan being funded by the Bahria Town.The line's construction is likely to start in the first quarter of 2017.

Blue Line
  • Merewether Tower Terminal
  • Numiash Chowrangi Terminal (to Green Line/Yellow Line)
  • Liaquatabad Station (to KCR)
  • Bahria Town Terminal
Yellow Line

The Yellow Line will extend from Numiash Chowrangi to Landi Station at a total length of 26 km (16 mi). The Sindh government and Karachi city government will be financing the majority of the project.[17]

Yellow Line
  • Numiash Chowrangi Terminal (to Blue Line/Green Line)
  • Landi Station Terminal (to KCR)
Red Line

The Red Line will extend from Model Colony to Regal Chowk Via Safoora Goth and University Road at a total length of 27 km (17 mi). Asian development bank will be financing the project.[17]

Red Line
  • Regal Chowk Terminal (to Blue Line/Yellow Line)
  • Regal Chowk Station Terminal (to KCR)
Orange Line
Orange Line Package-I

Orangi line would be spread over 3.75 kilometres of which one kilometer is an elevated lane. The construction started in summer of 2016 and is likely to completed by mid-2017. The line will have the capacity to carry upto 50,000 passengers daily and there would be a station after every kilometer. The line commence's from Shaharh-e-Quaideen and merge's with the Green Line at the board office
Do you guys have fare integration between the bus and circular railway? I find the Indian city transit systems lacking in this crucial area
 