What's new

INS Vikramaditya

Adux

SENIOR MEMBER
Joined
May 19, 2006
Messages
3,856
Reaction score
0
INS Vikramadiya, Kiev Class (Adm Gorshkov)

eb3bc52a20b17334bb5bb5566927c4db.jpg

ebc11dfa3bc05968f6326056d1303647.jpg

fb918aafdcd634d6526dc1a66b9ab47d.jpg

2c56cbdd3d1b43d18c1c772e49e61dcc.jpg

83bf113793158c53a1b1902f110f77d3.jpg



Vessel Type: Aircraft Carrier, Project 1143.

Future Commissions: Vikramaditya (formerly Admiral Gorskhov) - 2009.

Displacement: 44,570 tons.

Dimensions: Length - Not Known.
.................Beam - Not Known.
.................Draught - Not Known.

Complement: Not Known.

Originally built as the modified Kiev (Krechyet) Class (Type 1143.4) carrier Baku, she is the last in the series of four Project 1143 air defence ships, officially known as aviation cruisers. The vessel was designed by St. Petersburg's Nevskoye Design Bureau, led by Vassily Anikeyev as a VSTOL (Vertical Short Take-Off and Landing) carrier. She was laid down at the Chernomorsky Shipyard, Nikolayev in December 1978 and was launched on 31 March 1982. Some reports indicate the ship was launched on 17 April 1982. The ship was commissioned in December 1987 (some reports indicate January 1987), nine years after its building started, following sea trials which began in June 1986. The Baku was later renamed as the Admiral Flota Sovietskogo Sojuza Gorshkov (later changed to Admiral Gorshkov) to honour the Russian Navy's and arguably the modern world's greatest naval tactician, Admiral of the Fleet of the Soviet Union Sergei Georgievich Gorshkov who retired from Russian Naval service in 1985.

The Admiral Gorshkov was originally designed to carry twelve VSTOL Yak-38 [NATO: Forger] fighters, twelve Ka-27 [NATO: Helix-A] helicopters in the SAR (Search & Rescue) & ASW (Anti-Submarine Warfare) role and a pair of Ka-31 RLD [NATO: Helix] AEW helicopters. As the Yak-38 was a VSTOL (Vertical Short Take-Off and Landing) aircraft, the need for a long deck was not required and thus the forward area of the deck was fitted with twelve P-500 Bazalt [NATO: SS-N-12 Sandbox] cruise missile launchers and four Antey Kinzhal [NATO: SA-N-9 Gauntlet] surface-to-air missile launchers. When the Yak-38s were phased out of Russian Naval service in 1992, the carrier adopted a new role as a helicopter carrier. The ship suffered extensive damage in 1994 due to a boiler room explosion and a subsequent fire and she was docked at Severodvinsk on 02 February 1994. After extensive repairs she was finally put back to sea in 1995. However, she was withdrawn from service in 1996 and has remained docked at Severodvinsk since. Her sister ships were withdrawn by 1993.



Images and models of Admiral Gorshkov prior to her refit

The vessel was offered for sale to India and negotiations over acquiring the 44,570-tonne aviation cruiser for the Indian Navy have reportedly been on since 1994. The two countries signed a Memorandum of Understanding (MoU) in December 1998, during a visit by Russian Prime Minister Yevgeny Primakov, by which India agreed to acquire the carrier and fund a refit & refurbishing program. This program was developed by the Nevskoye Design Bureau and will be carried out at the Severnoye shipyard at Severodvinsk. Preparatory work for the proposed conversion is being carried out at the Northern Machine Building Enterprise at Severodvinsk. In October 2000, during a visit by Russian President Vladimir Putin, an inter-governmental agreement was signed confirming the acquisition of the vessel. The final contract of delivery was supposed to be signed in October/November 2001, but disagreements over the price of the conversion left the deal hanging.

In February 2002, during the visit of Russian Deputy Prime Minister Ilya Klebanov, acquisition of the aircraft carrier was again discussed, but still a fixed price could not be reached at. Finally on 20 January 2004 in New Delhi, the deal to acquire the aircraft carrier, was signed between Russian Defence Minister Sergei Ivanov and his counterpart, Defence Minister George Fernandes. The deal also consists of nearly 20 separate contracts for new shipboard weapons and technology. The conversion is expected to be completed within five years of contract signature, which results in the Indian Navy receiving the carrier only by 2009, which is around the time the Indian Navy's other aircraft carrier, INS Viraat is expected to retire. However a MoD Press Release, dated 21 July 2004, stated that the vessel is expected to be handed over to the Indian Navy in August 2008. The vessel is to be named as INS Vikramaditya, as per official communication from the Indian Navy.





Conceptual drawings and models of the Vikramaditya (formerly Admiral Gorshkov) after refit

While the aircraft carrier itself is coming for free, a substantial refit will be undertaken to bring the vessel up to modern naval standards. The cost for this refit is estimated to be in the region of $675 to $700 million. A related $740 million contract for 16 carrier-based MiG-29 aircraft has also been signed. The price of the MiG-29 contract was confirmed in an MoD press release, dated 22 December 2004. The contract also includes the full hardware for training maintenance and flying personnel, including simulators and interactive ground and sea based training systems. Delivery of the first aircraft are expected in June 2007 and is expected to commence before the upgrade of the carrier has been completed and before the carrier is transferred to India. An option to acquire 30 additional aircraft by 2015, is also included in the contract. The vessel will also carry a mix of Ka-28 ASW and Ka-31 AEW helicopters.

The conversion plans for the aircraft carrier would see all the armament, including the P-500 Bazalt cruise missile launchers and the four Antey Kinzhal surface-to-air missile launchers fitted on the front of the carrier, removed to make way for a 14.3º bow ski-jump. Two restraining stands will also be fitted, allowing combat aircraft to reach full power before making a ski-jump-assisted short take-off. The ability to launch only one aircraft at a time, might prove to be a hindrance. Under the modernization plan, the 20-ton capacity elevator beside the ship's island superstructure will remain unchanged, but the aft lift will be enlarged and its lift capacity increased to 30 tons. Three arresting gears would be fitted on the aft part of the angled deck, although the model (centre image) displayed above shows four. Navigation and carrier-landing aids would be refitted to support fixed-wing STOBAR (Short Take-Off But Arrested Recovery) operations including the LAK optical-landing system.
 
New Pictures, Of Mig-29K simulator for Vikramaditya







 
Vikrramaditya will be the King of the Indian Navy. BTW they are thinking about extending Viraat's life as well till around 2012. And by that time, IAC will also be inducted.

Ideally we should have 4 or 5 carriers instead of the Navy's requirement of 3.
 
If you look at the first Simulation Picture, We have one of the elevators at the left side. Not usually seen in CV's.
I expect the Aircarft loadout not 16 but 24.
 
Indeed, i did not notice that.

BTW do you have any idea as to what will be the displacement of IAC-2?
 
Malay,

There isnt much on IAC-2, And I cannot confirm on rumours, but All I have heard is, it is Catapult based System and it is going to be mostly based at Eastern Seaboard along with the New Eastern Naval base and also will have another permenant port at A&N Islands. Tonnage is being put at 80,000. There is a new project underway in Cochin to Enhance CSL capacity

I cannot confirm on this, but it came from a good source. Dont Expect the steel cutting till IAC-1 Comes out.
 
How much is the new built aircraft carrier is costing IN with the naval aircrafts of up to 26 aircrafts on board?
 
you guys do realise that this ship can become a sitting duck in a matter of seconds if she faces a sub right. and if not equiped with anti-sub hunting equiptment it will be a complete wast of money.
 
I actually think that the IN missed a trick with the Vikramaditya. They should have invested in the YAK 141 instead of the Mig's and Sukhoi's which are not really suited for real carrier ops. In the short term they could have used the harriers till the newer plane came online.

The Sukhoi's and Migs are limited to one aircraft taking off at a time and have a poor loadout compared to land based variants.
 
I actually think that the IN missed a trick with the Vikramaditya. They should have invested in the YAK 141 instead of the Mig's and Sukhoi's which are not really suited for real carrier ops. In the short term they could have used the harriers till the newer plane came online.

The Sukhoi's and Migs are limited to one aircraft taking off at a time and have a poor loadout compared to land based variants.

It was you who actually told YAk-141 is a stupid aircraft quite true, not a perfected tech at the point of time, the New MiG-29K is an amazing aircraft, But I am bothered about its loadout, there seems to something done about it with the seawasp engine, giving it more thrust. There is a lot of difference in Effective Loadout of Mig-29K of the carrier to that of the Big *** Su-33K. Indian Navy is planning to built 100 Fighter Aircraft Wing of its own as per various reports. MiG-29K can go upto 48.

Another thing, IN wants to Go for Conventional Aircrafts for its Carrier Wing, If at all there is going to be STOL Wing, it will placed in LPD, Very Similar to Av-8B in US Marines.
 
I actually think that the IN missed a trick with the Vikramaditya. They should have invested in the YAK 141 instead of the Mig's and Sukhoi's which are not really suited for real carrier ops. In the short term they could have used the harriers till the newer plane came online.

The Sukhoi's and Migs are limited to one aircraft taking off at a time and have a poor loadout compared to land based variants.

Could you give the details of the YAK 141 mate? Going by Yak's earlier performance, i would say it was bad. But what would we use int the long run then? Say they got Sea Harriers for short term use, then what? Its not as if F-35 is being planned even in the long term. They were considering Rafale M earlier, but cuz Russia insisted on a Russian a/c on Vikramaditya, MiG 29K was chosen.
 
How much is the new built aircraft carrier is costing IN with the naval aircrafts of up to 26 aircrafts on board?

Carrier is Free, But refitting has cost them $800 million as well as MIG-29K has come extra.
 
you guys do realise that this ship can become a sitting duck in a matter of seconds if she faces a sub right. and if not equiped with anti-sub hunting equiptment it will be a complete wast of money.

You do realise that a carrier does not travel alone, it has an entire compliment of its Carrier Battle Group.
And who told you that Vikramaditya or even Viraat dont have very good ASW? Or that even better ASW choppers are planned along with dedicated frigates.
 
Could you give the details of the YAK 141 mate? Going by Yak's earlier performance, i would say it was bad. But what would we use int the long run then? Say they got Sea Harriers for short term use, then what? Its not as if F-35 is being planned even in the long term. They were considering Rafale M earlier, but cuz Russia insisted on a Russian a/c on Vikramaditya, MiG 29K was chosen.

Yak-141 wasnt chosen
Russian navy didnt like it, as it was not perfected tech, too ahead of its time
There were no similar Upgrdation or New Programs for Yaks such as the K program for the MiG ans Su's
Indian is no longer looking for STOVL .
 
Back
Top Bottom