mr42O
SENIOR MEMBER
- Joined
- Aug 15, 2009
- Messages
- 6,178
- Reaction score
- 4
- Country
- Location
40.8 MW Koto Hydropower Project, District Dir (Lower)
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
• Name of River : Panjkora
• Location : Near Timergara
• Discharge : 126 Cusecs
• Head : 38 Meters
• Capacity : 40.8 MW
• Tunnel Length : 1.76 Km
• Energy : 205 Gwh
• Revised cost of project : Rs: 14.765 Billion
• Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
• Completion : Dec 2018
Koto Hydropower project is located on Panjkora river upstream of Timergara town in Distt: Dir (Lower). Salient features and status of the project is;
• Name of River : Panjkora
• Location : Near Timergara
• Discharge : 126 Cusecs
• Head : 38 Meters
• Capacity : 40.8 MW
• Tunnel Length : 1.76 Km
• Energy : 205 Gwh
• Revised cost of project : Rs: 14.765 Billion
• Approximate revenue per annum : Rs: 1.970 Billion @Rs. 9.62 per unit
• Completion : Dec 2018