Correction in the title Megawatt MW.
On top right look for Thread tools click it and drop-down-list-box opens choose edit the title.
Nandipur 450 mwtts is already added up , Terbella 4 is earthbreaked and contracted to sino hydro will produce in 2017 1400 mwts, Different dormat capacity 1500 mwts will be utilized in april , may due to the better availability of gas as the LNG will be available along with our own natural gas .
So not a single megawatt of electricity added in the last 2 years whereas PPP added more than 3000 megawatts in 5 years.
Neelum-Jhelum project
After being approved in 1989 (PPP government), the design was improved, increasing the tunnel length and generation capacity. The project was intended to begin in 2002 and be completed in 2008 but this time-frame experienced significant delays to rising costs and funding. At its appraisal in 1989, it was to cost $167 million USD (2011) and after another redesign in 2005, that cost rose to $935 million USD (2011).
LOL 3000 MW? from where ? air? so u mean after approving Neelum Jahlum in 1989 it done and build ? work didn't even started in 2008 to 2013 when PPP was in Federal
So not a single megawatt of electricity added in the last 2 years whereas PPP added more than 3000 megawatts in 5 years. Anyways some of the above ongoing projects were already ongoing in PPP's era.
Neelum-Jhelum project
After being approved in 1989 (PPP government), the design was improved, increasing the tunnel length and generation capacity. The project was intended to begin in 2002 and be completed in 2008 but this time-frame experienced significant delays to rising costs and funding. At its appraisal in 1989, it was to cost $167 million USD (2011) and after another redesign in 2005, that cost rose to $935 million USD (2011).
Nandipur
In January 2008, Pakistan Electric Power Company (PEPCO) signed a Rs. 23 billion ($329 million) contract with Dong Fang Electric Corporation of China to construct the Nandipur Power Project and paid it a 10 per cent down payment. Ongoing during PPP era.
Neelam dam is yet to be completed. Nandi pur has been failure so far. PPP failed in 5 years to add single MW, yet you expect N to add 10000?