What's new

China to build state of the art Nuclear Unit K-3 at Karachi

BetterPakistan

SENIOR MEMBER
Joined
Oct 30, 2014
Messages
2,907
Reaction score
-2
Country
Pakistan
Location
Pakistan
KARACHI: China and Pakistan are engaged in yet another state of the art project at the Karachi Nuclear Power Plant K3.

Construction is expected to start next month on the third unit at the K3 plant – the Karachi nuclear power plant using a reactor developed by China National Nuclear Corporation (CNNC), the China Daily reported.

The plant is being built by CNNC using Hualong One, its own third-generation nuclear reactor design.

CNNC spokesman Pan Jianming said on Monday it is the second nuclear power project in Pakistan to use the Hualong One technology, after construction started at the K2 plant in August last year.

“Hualong One was developed based on very mature technologies and the project is going very smoothly. It will help ease power shortages in the Karachi region after completion,” Pan told a forum in Fuqing, Fujian Province, where the Hualong One pilot project is based.

China National Nuclear Power, a CNNC subsidiary, currently has 14 nuclear reactors in operation, with 11 under construction in China.

Pakistan has been denied the civil nuclear technology by the world however China has again proved to be Pakistan’s all weather friend which is ready to support Pakistan in every thick and thin.

Karachi Nuclear Power Plants K2 and K3 are at least 12 meters higher than the sea level and the greatest Tsunami alert for Karachi is almost 2.5 meters high sea waves.

However some anti national elements in disguise of NGOs are spreading false propaganda against the Karachi Nuclear Power plants.

China and Pakistan are also in harmony over blocking the Indian bid to enter in the Nuclear Supplier Group (NSG).
 
. . .
I don't understand nuclear reactor k1 and k 2 can't generate enough power. For khi it's shocking
 
.
Last edited:
.
.
I don't understand nuclear reactor k1 and k 2 can't generate enough power. For khi it's shocking
k1 is from the 70's probably older than you. k2 is the same model as k3 which began ground breaking last year
1546322_602912296461330_2137845894_n1_zps3e8e538e.jpg
 
.
It says here: https://en.m.wikipedia.org/wiki/Nuc...00_MWe_class_.28CP0.2C_CP1_and_CP2_designs.29
that you extended the 900MWe life for 10 years in 2002.
Maybe they are all shutdown by now.

Sorry,I didn't get the question right,my bad. :P
-
They are still in activity.

reac.png


@Hamartia Antidote

The french approach is different: each unit receives an operating license for 10 years. After these 10 years,an inspection is organized to carry out checks and confirm the level of system security. If all the checks are satisfactory, a new operation authorization is granted for a period of 10 years.
 
.
nice development... but why build near heavily populated city, why not in Balochistan..? Iran is planning to have same plants in its Balochistan..
 
.
Hope it started soon.
The project is already under construction at a fast pace along with kanupp2 and expected to complete in 2020.

nice development... but why build near heavily populated city, why not in Balochistan..? Iran is planning to have same plants in its Balochistan..
It is very much closer to balochistan at the same place near kanupp1.

Sorry,I didn't get the question right,my bad. :P
-
They are still in activity.

View attachment 308216

@Hamartia Antidote

The french approach is different: each unit receives an operating license for 10 years. After these 10 years,an inspection is organized to carry out checks and confirm the level of system security. If all the checks are satisfactory, a new operation authorization is granted for a period of 10 years.
Same thing is carried out by pnra in Pakistan on regular basis as a regulator.

I don't understand nuclear reactor k1 and k 2 can't generate enough power. For khi it's shocking
Kanupp is operating at 90 MW whereas Kanupp 2 and 3 are under construction.
 
.
The project is already under construction at a fast pace along with kanupp2 and expected to complete in 2020.


It is very much closer to balochistan at the same place near kanupp1.


Same thing is carried out by pnra in Pakistan on regular basis as a regulator.


Kanupp is operating at 90 MW whereas Kanupp 2 and 3 are under construction.

kannup is situated at hawks bay Karachi not near Balochistan..
 
. . .
May ALLAH SWT bless our motherland with ability to overcome energy shortages; INSHA ALLAH will result in massive improvement of industries and the improvement in individuals life.

Only I am concerned about 'Mr Hoodbai' who will start criticising Pakistan upon it but no solutions for our urgent needs. I don't know to whom he want to please.
 
. .

Latest posts

Back
Top Bottom