Water Car Engineer
ELITE MEMBER
- Joined
- Sep 25, 2010
- Messages
- 13,313
- Reaction score
- 8
- Country
- Location
Frozen Design, 1:1 model being prepared for RCS test
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
None of the fifth-gen fighter on this planet mature that quickly.
lol, India already made Choppers that Quickly....
haha all key parts imported - engine, radar, missiles, fire control, sensor, yeah they don't weigh much, why don't you strap on 5 t metal, then 99% weight are made in India
You are estimating the AMCA timetable based on the chopper's project?Really?!lol, India already made Choppers that Quickly....
here come another dreamer ,lolHas anyone noticed the title.
AFTER LAC TEJAS
Is it operational or still being paraded on a truck
Has anyone noticed the title.
AFTER LAC TEJAS
Is it operational or still being paraded on a truck
Please enlighten me, which country did manage to wrap up the whole thing from first prototype to FOC in 5 years as you mentioned?Is it US or Russia,China?lol, your are new kid in the block, India approach is different, India developing Critical technology for the same, once technologies developed, they can be used in both ... most of technology is developed for LCA will be used in AMCA.
well i think ,Please enlighten me, which country did manage to wrap up the whole thing from first prototype to FOC in 5 years as you mentioned?Is it US or Russia,China?
Where does this "2032 FOC" comes from when you don't even have the first prototype ready, predicting the future?well i think ,
which country developed attack chopper and Light Chopper that fast also either in History.
Which Country able to turn AS missile into Land and Air launch missile?
Which country turned A2A missile into G2A missile etc etc ...
No other country develop ammo of Recoil guns which can blast one inch Thick armor of patton tank,
Which country send mission to Mars in first attempt?
Its planned , Like we said during mars probe also.....Where does this "2032 FOC" comes from when you don't even have the first prototype ready, predicting the future?
Where does this "2032 FOC" comes from when you don't even have the first prototype ready, predicting the future?
Don't you too import engines.haha all key parts imported - engine,
Depends over types, which too has been come up. Tejas Mk1A was last craft to use imported AESA, Indian AESA Uttam is ready now.radar
Mix of both homegrown & imported. Even current imported one are being replaced.missiles,
Flight control systems you meant I guess, its already Indian.fire control,
Depends on mission, cost & production.sensor,
You have been reported for trolling. @wazyeah they don't weigh much, why don't you strap on 5 t metal, then 99% weight are made in India
I am aware of that, Nobody in the world knows about the date of first flight , let alone FOC.Not much of a time line, yet. They are preparing the final design's 1:1 model right now, it's RCS testing will be done by end of the year. The proposal is already submitted to government for full funding for prototype development. Till that is approved, not much use in timelines at the moment.
Nobody knows unless it's unclassified, IMO, it's between 2019 & 2025.I am aware of that, Nobody in the world knows about the date of first flight