there is nothing to prove, see the news shortfall is now 4800mw and the current gov is not doing a bit about it. This is just because a project completed now the prime minister jumped up and declare that everything is fine. Do you actually think a power plant especially of this type complete in what 2years???
i still remember the day when our prime minister was on children television show a child asked him about frequent load shedding and he promised him that the power problem will be sort out within a year it was around 2008.I knew this was a lie at that time and i know there lies this time also.
Atleast musharraf was not a liar.
The contract for this was signed in 2006, to be completed in Jan 2008. However, construction on site did not event start till late 2008.
Shortfall has reached 5000MW today because demand crossed 17000MW. Production has increased, however demand keeps on rising.