Energy China Gezhouba Group has built the most advanced Steel Processing Plant in Pakistan with an area of 4200m2 for the construction of Suki Kinari (SK) Project Hydropower, a key project listed among the first batch of priority projects in the CPEC.
The main structure of the plant is a portal frame, equipped with a 4,000t frame hydraulic press, gantry crane, CNC cutting machine, welding cross arm, and a batch of advanced equipment. The plant is designed with a peak monthly production capacity of 950 tons.
The construction and operation of the plant have effectively promoted local employment. Chinese Contractor has "tailored" training programs for Pakistani employees, managing to improve their working skills and assist them in achieving a desired professional future.
.