Progress on Chashma Nuclear Power Project

Discussion in 'Pakistan Economy' started by Windjammer, May 30, 2016.

  1. Windjammer

    Windjammer ELITE MEMBER

    Messages:
    29,603
    Joined:
    Nov 9, 2009
    Ratings:
    +123 / 87,491 / -3
    Country:
    Pakistan
    Location:
    United Kingdom
    Chashma Nuclear Power Project Unit-3 & Unit -4, respectively known as C-3 & C-4.
    Both should be operational by 2017.


    [​IMG]

    [​IMG]


    [​IMG]

    [​IMG]

    [​IMG]
     
    • Thanks Thanks x 4
  2. Pakistanisage

    Pakistanisage PROFESSIONAL

    Messages:
    9,448
    Joined:
    Jul 29, 2011
    Ratings:
    +19 / 15,741 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    Terrific News...... Even though Chashma-3 was supposed to be operational in 2016, a bit of delay is understandable. As they say "Better late than never".

    Future of Nuclear Power Generation is bright as the newer Plants will produce 1120 Megawatt each with the next generation Power Plant possibly reaching 5000 to 10,000 Range.

    By 2020, 9,000 Megawatt will be produced by Nuclear, as there are 7 Nuclear Plants under construction, each producing 1120 Megawatt.

    Nuclear is the Future........
     
    Last edited: May 30, 2016
    • Thanks Thanks x 9
  3. Dr Shaheryar

    Dr Shaheryar FULL MEMBER

    Messages:
    616
    Joined:
    Mar 18, 2016
    Ratings:
    +0 / 415 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    Will be a boost to our capability.
     
  4. weqi

    weqi FULL MEMBER

    Messages:
    291
    Joined:
    Nov 15, 2012
    Ratings:
    +0 / 77 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    will be a biggest boost to the economy what about KANUPP
     
  5. Muhammad Omar

    Muhammad Omar ELITE MEMBER

    Messages:
    12,720
    Joined:
    Feb 3, 2014
    Ratings:
    +13 / 18,867 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    C-3 will be operational in the end of 2016
     
    • Thanks Thanks x 1
  6. PAKISTANFOREVER

    PAKISTANFOREVER SENIOR MEMBER

    Messages:
    6,545
    Joined:
    Aug 15, 2015
    Ratings:
    +13 / 8,632 / -13
    Country:
    United Kingdom
    Location:
    Pakistan

    WOW. This will certainly boost our economy and nuke capability. Pakistan Zindabad. China Zindabad. Long live Pakistan & China brotherhood. Nothing on this earth can break this bond.

    :china::pakistan:
     
  7. Windjammer

    Windjammer ELITE MEMBER

    Messages:
    29,603
    Joined:
    Nov 9, 2009
    Ratings:
    +123 / 87,491 / -3
    Country:
    Pakistan
    Location:
    United Kingdom
    August 2016 is the mentioned date, any idea what's their capacity.
     
  8. Major Sam

    Major Sam STAFF

    Messages:
    2,561
    Joined:
    May 8, 2011
    Ratings:
    +0 / 3,529 / -3
    Country:
    Pakistan
    Location:
    Malaysia
    i think 340 MW
    C3 and C4.

    C5 will have 1000MW.
     
  9. Windjammer

    Windjammer ELITE MEMBER

    Messages:
    29,603
    Joined:
    Nov 9, 2009
    Ratings:
    +123 / 87,491 / -3
    Country:
    Pakistan
    Location:
    United Kingdom
    Yup, it's 340 MW for each unit.
     
  10. Arsalan

    Arsalan MODERATOR

    Messages:
    15,140
    Joined:
    Sep 29, 2008
    Ratings:
    +48 / 19,128 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    340 MW each. Now if i say only, people will say i am from PTI.
    Trust me, i have experienced this.

    ground breaking in 2013,
    did it again in 2015 this time calling it "inauguration" of the project. Not much details are available till then but as per my discussion with someone at Chasma, Chasma is the priority and nothing considerable is happening at KANUPP as yet apart from some slow construction word etc. That is at a very slow pace, The K-2 and K-3 are however planned for 1100 MW capacity each, that is significant.
     
    Last edited: May 30, 2016
    • Thanks Thanks x 2
  11. war&peace

    war&peace ELITE MEMBER

    Messages:
    25,620
    Joined:
    Aug 12, 2015
    Ratings:
    +14 / 43,791 / -12
    Country:
    Pakistan
    Location:
    Sweden
    Good news but pace is too slow. Too little and too late. Pakistan should have added 20,000 MW of nuclear power alone at least five years ago. But we have incompetent govts. Everything takes 4 fold longer time than necessary due to sluggish bureaucracy and harmful democracy/politics. Pakistan has lost billions of dollar due to lack of energy just to put things in perspective China added 30753 MW of wind power alone in just one year-2015 and there is no energy crisis in China like in Pakistan but it is planning for the future and also want to switch from dirty fossil fuels and coal power to more renewables, a very sane decision. Can we learn anything from our old friend? or we will keep investing in dirty and old fossil fuel because kickbacks are quite high in it.
     
    Last edited: May 30, 2016
    • Thanks Thanks x 2
  12. Windjammer

    Windjammer ELITE MEMBER

    Messages:
    29,603
    Joined:
    Nov 9, 2009
    Ratings:
    +123 / 87,491 / -3
    Country:
    Pakistan
    Location:
    United Kingdom
    So much could have been done , dams built plants inducted or other projects completed.
    Successive governments have been incompetent in more ways than one.
    Albeit at slow pace but at least the ball is rolling, the news from Thar coal project is also encouraging, hopefully in the next few years we will see the end of the power shortages.
     
    • Thanks Thanks x 3
  13. Taimoor Khan

    Taimoor Khan BANNED

    Messages:
    7,253
    Joined:
    Jan 20, 2016
    Ratings:
    +7 / 8,937 / -7
    Country:
    Pakistan
    Location:
    United Kingdom
    How much plutonium we are going to chrun out of this baby?
     
    • Thanks Thanks x 1
  14. weqi

    weqi FULL MEMBER

    Messages:
    291
    Joined:
    Nov 15, 2012
    Ratings:
    +0 / 77 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    slow pace at KANUPP means no power to karachi industries for next more years means high production costs closure of export houses reduction in exports and tax collections government itself creating problem for them and nation also WHY , WHY WHY
     
  15. Arsalan

    Arsalan MODERATOR

    Messages:
    15,140
    Joined:
    Sep 29, 2008
    Ratings:
    +48 / 19,128 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    Shhh,,, dont talk like this,,, Jamhoriat ko khatra haa!! :lol:

    On a serious note, it is slow as i mentioned but it is not "non-existent". Construction work is moving forward albeit slowly, but forward at least. What we need to do is to speed things up there as well as it is KANUPP that will contribute something substantial to the national grid with 1100 MW capacity each.