    ISLAMABAD: Pakistan has decided to export electricity to Tajikistan in winter season through CASA-1000 project as in the power purchase agreement (PPA), a reverse flow of electricity clause was included and to this effect the authorities in Power Division would soon engage their counterparts in Tajikistan, a senior official of Power Division told The News.

    Under the agreement, the official said, once the CASA-1000 project is completed, Pakistan will import 1,000MW electricity from Tajikistan at 9 cents per unit in summer season for 5 months from May to September, but now authorities in Islamabad have made up their mind to export 1,000MW electricity to Tajikistan through the same project in winter as hydro generation in Tajikistan turns zero.

    The official said Pakistan has now gained the capacity to generate electricity close to 30,000MW and in winter the demand in Pakistan hovers around 11,000-13,000MW at the maximum and the country is in a position to export the surplus electricity up to 1,000MW to Tajikistan at affordable prices, as CASA transmission line possesses the capacity to transmit electric power up to 1,000MW only.

    “And if Pakistan enters the deal for export of 1,000MW power at the same price of 9 cents, then net financial impact will be zero on both the countries as the electricity of the same quantity from both sides will be swapped (traded) in different seasons which means that Pakistan will import electricity in summer and export it to Tajikistan in winter,” said the official.

    The construction agreement has been signed among four countries (Kyrgyzstan, Tajikistan, Afghanistan and Pakistan) under the project CASA-1000. Sweden-based well known company in power sector -- ABB -- has been selected through ICB for building two converters to be installed each in Nowshera (Pakistan) and another one in Sungtuda (Tajikistan) at the cost of $313 million. However, the total cost of the project of HVDC (high voltage direct current) transmission line including converters stands at $1.17 billion.

    The HVDC transmission line will be laid from Sangtuda in Tajikistan and is to pass through Kunduz, Pul-e-Khumri, Kabul and Jalalabad in Afghanistan and end up in Peshawar. The total length of the transmission line is estimated to be 750km, 16 percent of which would pass through Tajikistan, 75 percent through Afghanistan and 9 percent through Pakistan.

    However, under the master agreement of CASA-1000, a transmission line would originate in the Kyrgyz Republic and Tajikistan and pass through Afghanistan to reach Pakistan. The project will comprise the development, financing, construction, ownership and operation of the AC and DC facilities.

    This would include a 750km high voltage direct current transmission system between Tajikistan and Pakistan via Afghanistan, together with associated converter stations at Sangtuda (1,300MW), Kabul (300MW) and Peshawar (1,300MW).

    A 477km 500-KV alternating current facility would also run between the Kyrgyz Republic (Datka) and Tajikistan (Khoujand). System upgrades would also be required to safely and reliably accommodate the AC and DC facilities and the associated power flows.

    https://www.thenews.com.pk/print/402086-pakistan-to-export-electricity-to-tajikistan-in-winter
     
    • Thanks Thanks x 9
  2. Imran Khan

    Imran Khan PDF VETERAN

    Messages:
    43,393
    Joined:
    Oct 18, 2007
    Ratings:
    +33 / 75,818 / -35
    Country:
    Pakistan
    Location:
    Pakistan
    upload_2018-12-5_21-33-33.jpeg
     
    • Thanks Thanks x 7
  3. JohnWick

    JohnWick FULL MEMBER

    Messages:
    1,231
    Joined:
    Nov 13, 2018
    Ratings:
    +0 / 425 / -1
    Country:
    Pakistan
    Location:
    Pakistan
  4. Imran Khan

    Imran Khan PDF VETERAN

    Messages:
    43,393
    Joined:
    Oct 18, 2007
    Ratings:
    +33 / 75,818 / -35
    Country:
    Pakistan
    Location:
    Pakistan
    itni waafir bijli hai to water heater lagwa deen electrical log roz free nahaya kareen gay :lol:
     
    • Thanks Thanks x 2
  5. Jaanbaz

    Jaanbaz ELITE MEMBER

    Messages:
    9,112
    Joined:
    May 7, 2013
    Ratings:
    +16 / 13,539 / -7
    Country:
    Pakistan
    Location:
    United Kingdom
    [​IMG]
     
    • Thanks Thanks x 1
  6. JohnWick

    JohnWick FULL MEMBER

    Messages:
    1,231
    Joined:
    Nov 13, 2018
    Ratings:
    +0 / 425 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    Sir itni bijla ha k bs moft electric heater se connect tubewell lagwaien ge.

    Why?
     
  7. Dubious

    Dubious MODERATOR

    Messages:
    29,172
    Joined:
    Jul 22, 2012
    Ratings:
    +61 / 59,566 / -5
    Country:
    Pakistan
    Location:
    Pakistan
    • Thanks Thanks x 2
  8. Jaanbaz

    Jaanbaz ELITE MEMBER

    Messages:
    9,112
    Joined:
    May 7, 2013
    Ratings:
    +16 / 13,539 / -7
    Country:
    Pakistan
    Location:
    United Kingdom
    Pakistan main electricty ka shortage hay tu export kiya karaingaain hum?
     
  9. JohnWick

    JohnWick FULL MEMBER

    Messages:
    1,231
    Joined:
    Nov 13, 2018
    Ratings:
    +0 / 425 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    Shortage nahi blka ziada hai .....isleya krein ga statistics uper hain.....ab yeh or batt ha k woh ghlat ho sakti hain.....
     
    • Thanks Thanks x 1
  10. Jaanbaz

    Jaanbaz ELITE MEMBER

    Messages:
    9,112
    Joined:
    May 7, 2013
    Ratings:
    +16 / 13,539 / -7
    Country:
    Pakistan
    Location:
    United Kingdom
    Pakistan main loadshedding band hogai ab?
     
  11. JohnWick

    JohnWick FULL MEMBER

    Messages:
    1,231
    Joined:
    Nov 13, 2018
    Ratings:
    +0 / 425 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    Mere ilaqa mein tuh ab nae jati......jti ha tu bht kmmm
     
    • Thanks Thanks x 1
  12. Dubious

    Dubious MODERATOR

    Messages:
    29,172
    Joined:
    Jul 22, 2012
    Ratings:
    +61 / 59,566 / -5
    Country:
    Pakistan
    Location:
    Pakistan
    My area too....it goes for like 1 hr randomly...like once in 2-3 days

    or maybe it goes when I am asleep...I dont really know since we dont need the ac and we got ups that sustains the 1 hr loss
     
    • Thanks Thanks x 2
  13. JohnWick

    JohnWick FULL MEMBER

    Messages:
    1,231
    Joined:
    Nov 13, 2018
    Ratings:
    +0 / 425 / -1
    Country:
    Pakistan
    Location:
    Pakistan
    yes same the case with me sir........
    This issue is much controlled......

    In winter season there is also no issue of the charge out ups ......only a zero watt bulb glows which doesn't effect...
     
    • Thanks Thanks x 1
  14. Jaanbaz

    Jaanbaz ELITE MEMBER

    Messages:
    9,112
    Joined:
    May 7, 2013
    Ratings:
    +16 / 13,539 / -7
    Country:
    Pakistan
    Location:
    United Kingdom
    That's good news. Can anyone from Karachi tell me how is the situation now? I know it used to be pretty bad before.
     
    • Thanks Thanks x 1
  15. bananarepublic

    bananarepublic FULL MEMBER

    Messages:
    1,291
    Joined:
    Jan 15, 2015
    Ratings:
    +4 / 1,412 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    bhe***d we barely get 3 hours of electricity here in gilgit during winters . first solve the electricity shortfall of rest of country then sell it
     
    • Thanks Thanks x 1