Electricity production hits a record low

Discussion in 'Social & Current Events' started by mr.robot, Jan 10, 2017.

  1. mr.robot

    mr.robot FULL MEMBER

    Messages:
    856
    Joined:
    Sep 16, 2014
    Ratings:
    +1 / 887 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    [​IMG]
    Only 5500 megawatts are being produced while circular debt has reached PKR 675 billion

    ISLAMABAD (Dunya News) – It was stated by the sources that only 5500 megawatts of electricity are being produced to meet nationwide needs which is a record low.

    Government and private power plants have reduced their electricity production due to non-payments. Circular debt reached as far as PKR 675 billion because the private and government power plants were not granted billions of rupees in payment.

    Currently, the country is facing long hours of unannounced load shedding. The big cities are witnessing unannounced power outage of about 4 to 6 hours every day.

    If the power houses are not returned payments, the duration of load shedding is expected to worsen.

    http://dunyanews.tv/en/Pakistan/369762-Electricity-production-hits-a-record-low
     
    Last edited: Jan 10, 2017
    • Thanks Thanks x 2
  2. Peregrine_Falcon

    Peregrine_Falcon FULL MEMBER

    Messages:
    452
    Joined:
    Nov 3, 2016
    Ratings:
    +0 / 620 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    It can't be 550 MW's anyway, i think there's a typo.

    But the thing that worries me is Rs 675 billion circular debt
     
    • Thanks Thanks x 2
  3. mr.robot

    mr.robot FULL MEMBER

    Messages:
    856
    Joined:
    Sep 16, 2014
    Ratings:
    +1 / 887 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    You are right. I guess that a zero is missing. It is likely 5500 MW. From two days, my hometown is facing almost 18 Hours load shedding.

    Sir! Have a look if you can find any official figures. @Zaki
     
    • Thanks Thanks x 1
  4. Syed.Ali.Haider

    Syed.Ali.Haider ELITE MEMBER

    Messages:
    29,701
    Joined:
    Sep 29, 2010
    Ratings:
    +52 / 26,389 / -3
    Country:
    Pakistan
    Location:
    United States
    How many times have I reminded PDF that loadshedding is here to stay for the foreseeable future in Pakistan, regardless of the claims being made.
     
    • Thanks Thanks x 3
  5. uzairkbaloch

    uzairkbaloch FULL MEMBER

    New Recruit

    Messages:
    8
    Joined:
    Jan 11, 2017
    Ratings:
    +0 / 2 / -0
    Country:
    Pakistan
    Location:
    Pakistan
    Afsos
     
  6. Clutch

    Clutch SENIOR MEMBER

    Messages:
    2,348
    Joined:
    Aug 3, 2008
    Ratings:
    +3 / 2,456 / -1
    There have been a number of power plants that have come online due to all the infrastructure cpec and other projects...

    What gives? How is this possible?
     
  7. Śakra

    Śakra SENIOR MEMBER

    Messages:
    2,113
    Joined:
    Jul 18, 2016
    Ratings:
    +0 / 2,284 / -6
    Country:
    India
    Location:
    Canada
    I've mentioned this before that just because you build powerplants doesn't mean you will have power. If the electricity board can't afford to buy the electricity, nothing is coming to your home.
     
    • Thanks Thanks x 3
  8. suresh1773

    suresh1773 FULL MEMBER

    Messages:
    1,396
    Joined:
    Jun 1, 2014
    Ratings:
    +0 / 683 / -4
    Country:
    India
    Location:
    India
    Poor answer, Why do u think in a negative manner
     
  9. sparten

    sparten SENIOR MEMBER

    Messages:
    1,040
    Joined:
    Mar 11, 2006
    Ratings:
    +3 / 506 / -0
    That is true. But what you don't mention is that new projects have electricity production which is cheaper than existing ones.

    (Numbers for illustration only)
    Lets say that you need 20,000 MW and have infrastructure for 25,000 MW. Lets say it a cost of $1.5 BN for 10,000 MW. Of which you can only pay $ 2 Bn. Result is actual generation of 15,000 MW. Shortfall of 5000 MW.

    Now lets say with new projects the infrastructure remains at 25,000 MW, but cost is 750 Million per 10,000 MW. You can purchase 20,000 MW for 1.5 Bn. Result? No loadshedding.
     
  10. iExpli1t