What's new

China Pakistan Economic Corridor (CPEC) | Power Plants

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
Updated photographs of Diversion Tunnels Dasu_Hydropower Project

The project is expected to start electricity generation in the second half of 2024, while all six units of the Stage-I, with cumulative generation capacity of 2160MW, will be completed by early 2025.

Dasu Hydropower Project is being constructed on the River Indus upstream of Dasu town. WAPDA is implementing the project in two stages – each stage having a generation capacity of 2160MW.

On completion, Stage-I of the project will contribute more than 12 billion units of electricity per annum to the National Grid. The Stage-II, after its completion, will also provide another 9 billion units to the system every year.



1600347429133.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
After 867 days of construction, the spillway road bridge for Karot Hydropower Station was completed and officially open to traffic on last Sunday (Sep 13th).


1600348384932.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
Recently, the concrete casting of the 170m-high chimney of the 2×660MW Thar Block-1 Coal Project has been finished. As a landmark building in Thar coalfield, the completion laid foundation for subsequent construction of desulfurization area of the power station.


1600526904416.png







1600526943903.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
Suki Kinari Hydropower Project (884MW)– Another Landmark Achieved

On 19th September, the last drilling rod of raise boring rig broke through the last barrier and successfully penetrated the headrace tunnel. The surge shaft total depth is 233m with a diameter of 7.45. The completion of pilot hole lay down a solid foundation for the smooth excavation of the surge shaft in the later period.



1600617367633.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
Updated photographs of Diversion Tunnels Dasu_Hydropower_Project


The project is expected to start electricity generation in the second half of 2024, while all six units of the Stage-I, with cumulative generation capacity of 2160MW, will be completed by early 2025.

Dasu Hydropower Project is being constructed on the River Indus upstream of Dasu town. WAPDA is implementing the project in two stages – each stage having a generation capacity of 2160MW.

On completion, Stage-I of the project will contribute more than 12 billion units of electricity per annum to the National Grid. The Stage-II, after its completion, will also provide another 9 billion units to the system every year.



1600703545271.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
Under Construction Dasu Hydropower Project - 4320MW

The recent photographs showing construction progress of Underground powerhouse and Transformer Cavern. The Pilot Tunnel for the excavation of Main Powerhouse Cavern is in-progress and about 40% completed. On completion, it will laydown foundation for widening/benching of powerhouse cavern. Furthermore, the benching of Diversion tunnels are in progress.


1600785289709.png
 

ghazi52

PDF THINK TANK: ANALYST
Mar 21, 2007
50,870
54
76,778
Country
Pakistan
Location
United States
On September 23, the top heading of the diversion tunnel A at DASU Hydropower Project was successfully breakthrough. This is another important milestone in the construction of the project after the diversion tunnel no. B was completed.
Two diversion tunnels with extra-large cross-sections has been designed. The D-shaped tunnels have 24.4 m width and 27.2 m height, and the total length is 2,765 meters.
 

Users Who Are Viewing This Thread (Total: 1, Members: 0, Guests: 1)

Top