Thanks. You beat me to it. That's the finalized AMCA variant.Wow ... no-one posted the latest iteration?
View attachment 709899
View attachment 709900
View attachment 709898
Please make a list of what airplanes these Indian private firms designed and manufactured.But there is a difference in this project. Unlike the LCA, state entities don't control this project. The lead is now designated as Larsen & Tubro. Indian private firms are generally very efficient.
All your radars are either imported or produced based foreign technologies, India's detection capability is well known to everyone except India fanboys.Very few of the non-chinese jets will have questions on final RCS performance. While the opinion on J-20 universally is 'we'd like the Chinese to believe their J20 is invisible to our radar'
RAM Coatings had been developed by DRDO in mid 1990s itself. At that time they were able to absorb 85% of all radar waves . Right now they can absorb 98 to 99% of all Radar waves I believe. porbably more. This tech
yes, another example of fantasy created by India fanboy.is fully mature in India.
does i seen a DSI on final design on AMCA???Wow ... no-one posted the latest iteration?
View attachment 709899
View attachment 709900
View attachment 709898
does i seen a DSI on final design on AMCA???
Please make a list of what airplanes these Indian private firms designed and manufactured.
All your radars are either imported or produced based foreign technologies, India's detection capability is well known to everyone except India fanboys.
Don't have any expectations on Project Azm. It will not succeed. The biggest factor for Aviation project is money. You don't have it. We tried to build the LCA with a royal 3 Billion budget for plane+ infra+ engine. It went through a very painful process that extended the project life a lot. I don't think you'll be able to cough up even that- and a good stealth jet will cost about 8 to 10 Billion in R&D.
yes, another example of fantasy created by India fanboy.
Yes, DSI for AMCA and TEDBF as well.Seems so
Yes, DSI for AMCA and TEDBF as well.
project azm? We? How Chinese building LCA? And project Azm is not an Indian project, we don't try to act like we are Arabs or turk. The project name is AMCA.Please make a list of what airplanes these Indian private firms designed and manufactured.
All your radars are either imported or produced based foreign technologies, India's detection capability is well known to everyone except India fanboys.
Don't have any expectations on Project Azm. It will not succeed. The biggest factor for Aviation project is money. You don't have it. We tried to build the LCA with a royal 3 Billion budget for plane+ infra+ engine. It went through a very painful process that extended the project life a lot. I don't think you'll be able to cough up even that- and a good stealth jet will cost about 8 to 10 Billion in R&D.
yes, another example of fantasy created by India fanboy.
Yes they've started setting up the stalls, so initial sets of pics have already started coming out. Not yet seen an AMCA model, but this is the Tejas Mk2 model that is being displayedBy the way, any news from the preparations for the Aero India 2021? ... only two days left!
I think HAL wingman achieves today's feat for only of our government's continuous effort in indigenising aerospace ecosystem.I can not still believe this that India prepares this giant in just 1.5 years.Yes they've started setting up the stalls, so initial sets of pics have already started coming out. Not yet seen an AMCA model, but this is the Tejas Mk2 model that is being displayed
Pitot probe is gone
New mounting strip for the canards below the canopy sill
Not yet clear if it's a fixed probe or not
New boundary layer spillway duct that spills turbulent boundary layer air onto the wing from near the intakes. That is one area that needs to be clarified at AI-21.
![]()
Another surprise was this - the model of the HAL Loyal Wingman
![]()
![]()
This is only a mockup..but from what I've heard, work is on in full swing on the Loyal Wingman as part of the Combat Air Teaming System (CATS) program..I think HAL wingman achieves today's feat for only of our government's continuous effort in indigenising aerospace ecosystem.I can not still believe this that India prepares this giant in just 1.5 years.
What a surprise![]()